Similar Projects
Runway Precision Approach Path Indicator - 49015 - City of Fullerton
Renovation, Infrastructure, Alteration
Conception
$250,000 est. value
Fullerton, CA 92833

Adams Avenue Active Transportation Project - City Of Costa Mesa
Alteration
Conception
$3,750,000 est. value
Costa Mesa, CA 92626

Center Greens - City of Anaheim
Infrastructure
Design
$3,520,000 CJ est. value
Anaheim, CA 92805

Grace Church Of Orange Sports Building
New Construction, Infrastructure - 8,662 SF
Design
$2,000,000 CJ est. value
Orange, CA 92869

Irvine Ranch Water District Well Water Treatment System
Alteration
Post-Bid
$4,500,000 est. value
Orange, CA

Edinger Pump Station Replacement
Renovation
Post-Bid
Orange, CA 92866

Miscellaneous Water Vault Nos. 26, 33, snd 55 Rehabilitation/Abandonment
Infrastructure
Results
$792,000 est. value
Anaheim, CA 92805

Avenida Pico Recycled Water Pipeline Relocation (Permanente Pipeline)
Infrastructure
Results
$162,000 est. value
San Clemente, CA 92673

AutoZone #3001 / Anaheim
New Construction, Infrastructure - 7,000 SF
Construction
$1,500,000 CJ est. value
Anaheim, CA 92801

San Juan Hills High School Turf Replacement Project
Infrastructure
Construction
$668,535 CJ est. value
San Juan Capistrano, CA 92675

Domingues at McVay Subdivision
New Construction, Infrastructure
Pending Verification
Huntington Beach, CA 92647

Fire Station No. 4 Replacement - City of Laguna Beach
Demolition, New Construction, Infrastructure - 9,975 SF
Pending Verification
$6,100,000 CJ est. value
Laguna Beach, CA 92651

City Hall - Cast Iron Drainage Repipe - City of Costa Mesa
Infrastructure
Conception
$300,000 est. value
Costa Mesa, CA 92626

Placentia Avenue Stormwater Quality Trash Full-Capture System - City of Costa Mesa
Infrastructure
Design
$350,000 CJ est. value
Costa Mesa, CA 92627

FY 2021-22 Annual Pavement Preservation Project (Zone 6)
Infrastructure
Post-Bid
$6,220,000 CJ est. value
Yorba Linda, CA 92886

Last Updated 07/19/2023 01:20 PM
Project Title

Bay Bridge Pump Station and Force Main Replacement

Physical Address View project details and contacts
City, State (County) Fountain Valley, CA 92708   (Orange County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected May 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $46,123,469 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project will replace the existing Bay Bridge Pump Station to meet current building, electrical, and safety codes and OC San's design standards. The associated force mains will also be replaced. Project is included in the Orange County Sanitation District's FY 2023-2027 Capital Improvement Plan (CIP). Per the owner, as of July 19, 2023, a design team has been selected. The owner states that the project is expected to be advertised in November 2023 and construction is anticipated to begin in May 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents