Similar Projects
Renovation of the Correction Facility For Clayton County
Post-Bid
Lovejoy, GA 30236

Tooms County Courthouse and Detention Center Renovation and Expansion Project
Renovation, Addition - 55,000 SF
Post-Bid
$25,000,000 to $35,000,000 est. value
Lyons, GA 30436

Construction Management Services for Jail Dorm Infill
Results
Less than $350,000 est. value
Jefferson, GA 30434

Roger State Prison Kitchen Renovation
Renovation
Results
Reidsville, GA 30453

Rabun County Jail Addition and Sheriff's Administration Building
Addition - 6,000 SF
Construction
GA

Pierce County Jail Addition - Construction Management At Risk
Construction
Blackshear, GA

Rabun County Jail and Sheriffs Administration Building
Post-Bid
Clayton, GA

Renovations Of The Correctional Facility
Results
Lovejoy, GA 30228

Augusta YDC Academic Building and 56 Bed Housing Unit
New Construction
Post-Bid
Augusta, GA 30906

Renovations To Carroll County Jail
Renovation
Results
Carrollton, GA 30116

Coweta County Jail Expansion
Addition - 55,000 SF
Post-Bid
Newnan, GA 30263

Hart County Jail
New Construction
Results
GA

Professional Design, Pre-Construction Services for the New Long County Jail
New Construction
Post-Bid
Ludowici, GA

Comprehensive Operation Preventive And Predictive Maintenance Services
Renovation
Results
Atlanta, GA

Jasper County Jail Additions and Renovations
Renovation, Addition
Post-Bid
GA

Reported 02/01/2022 03:24 PM
Project Title

Jail Bathroom Renovations

Physical Address View project details and contacts
City, State (County) Woodbine, GA 31569   (Camden County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work: The (2) restrooms will be deconstructed to the walls and piping. There will be alternate restrooms available to the public during the renovations provided by Camden County. Men’s Restroom: Install (3) free standing ADA compliant sinks with hands free faucets, clean and seal the tile floors, (1) urinal at standard height with automatic flush valve, (2) Toilets with automatic flush valves one of which is ADA compliant, stall partitions, (2) 4ft LED light fixtures with 5K LED light bulbs, new drop ceiling grid and paneling, new supply and return grills for the AC ducting, a new door with all associated hardware to include options for hands free opening, (3) mirrors above the sinks, (3) Coastwide hands free soap dispensers or equivalent, (1) Coastwide hands free paper towel dispenser or equivalent, (1) Bosch hand dryer or equivalent, repair/patch any walls, paint all walls with color provided by the County, install back splash behind each toilet (metal or tile), (2) Coastwide toilet paper holders or equivalent, and all ADA required hardware for the ADA stall. Women’s Restroom: Install (3) free standing ADA compliant sinks with hands free faucets, clean and seal the tile floors, (3) Toilets with automatic flush valves one of which is ADA compliant, stall partitions, (2) 4ft LED light fixtures with 5K LED light bulbs, new drop ceiling grid and paneling, new supply and return grills for the AC ducting, a new door with all associated hardware to include options for hands free opening, (3) mirrors above the sinks, (3) Coastwide hands free soap dispensers or equivalent, (1) Coastwide hands free paper towel dispenser or equivalent, (1) Bosch hand dryer or equivalent, repair/patch any walls, paint all walls with color provided by the County, install back splash behind each toilet (metal or tile), (2) Coastwide toilet paper holders or equivalent, and all ADA required hardware for the ADA stall.

Details

Prison/Jail, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 13 - Special Construction, Building Modules, Bathroom Unit Modules.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents