Similar Projects
General Site East Campus Utility Improvements
Infrastructure
Design
Columbia, MO

Medical Science Building Courtyard Storm Water Drainage & Landscape
Infrastructure
Design
Columbia, MO

Darby Place Road Stormwater Improvements
Infrastructure
Bidding
Jefferson City, MO

Tucker 10 Manhole Replacement (IR)
Infrastructure
Bidding
Saint Louis, MO

Union Road 100 Block Storm Improvements
Post-Bid
Saint Louis, MO 63114

2021 Emergency Repairs and On-Call Sewer
Term Contract
Post-Bid
Joplin, MO

Stanwood Dr and Belwood Dr Storm Sewer & Bank Stabilization
Results
$351,000 est. value
Normandy, MO 63121

Euclid 4130 and 4136 Bioretention CSO VR GI
Results
$250,000 est. value
Saint Louis, MO

Stormwater Update
Alteration
Pending Verification
Jefferson City, MO 65109

Stormwater Update
Alteration
Pending Verification
Jefferson City, MO 65109

Marine Avenue Resurfacing And West Port Plaza Drive Intersection Improvement
Infrastructure
Bidding
Maryland Heights, MO 63043

Great Rivers Greenway Connector Project Part A
Infrastructure
Post-Bid
$3,000,000 est. value
Brentwood, MO 63144

Minnie Ave to Greenhaven Storm Sewer Separation
Results
$183,000 est. value
Flordell Hills, Jennings, MO

Pond Grover Parkway Retention Basin Maintenance
Infrastructure
Bidding
Wildwood, MO

Rough Site Grading, Parking and Storm Water System Installation
Infrastructure
Post-Bid
Columbia, MO

Reported 03/11/2022 12:00 AM
Project Title

Muddy Creek Regional Stormwater Detention Basin

Physical Address View project details and contacts
City, State (County) Harrisonville, MO   (Cass County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Clearing, grading, filling, compaction, reinforce concrete spillway and outlet works, reinforced concrete pipe, underdrain, rock riprap, and site restoration for the Muddy Creek detention dam and spillway.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents