Similar Projects
RFQ Design - Professional Engineering Services - SIA Fuel Facility Modernization and Expansion
Addition, Demolition, Renovation, Infrastructure
Conception
$2,270,000 CJ est. value
Spokane, WA 99224

RFQ Design - Architectural/Engineering Services for Public Works Office and Shops Building Project
New Construction, Demolition, Infrastructure
Conception
Spokane, WA

Koz on West 4th Avenue
New Construction, Infrastructure - 172,000 SF
Design
$98,800,000 CJ est. value
Spokane, WA 99204

Koz on West 4th Avenue
New Construction, Infrastructure - 172,000 SF
Design
$98,800,000 CJ est. value
Spokane, WA 99204

2022 Felts Field Site Improvements
Infrastructure
Post-Bid
Spokane, WA 99212

Evergreen Road Preservation
Infrastructure
Post-Bid
Spokane Valley, WA

Doris Morrison Learning Center Building Site and Trail
Renovation, Infrastructure - 6,000 SF
Results
WA

Sprague Union District Cso-34 Tank Above Ground Development
Infrastructure
Results
Less than $300,000 est. value
Spokane, WA 99202

Spokane International Airport Concourse C Trex - Bid Package No. 20 - General Construction
Addition, LEED Certification, Renovation, Infrastructure
Construction
$15,950,000 CJ est. value
Spokane, WA 99224

Pines Road Apartment Complex
New Construction, Infrastructure - 36,800 SF
Pending Verification
$4,000,000 CJ est. value
Spokane Valley, WA 99216

Pines Road Apartment Complex
New Construction, Infrastructure - 36,800 SF
Pending Verification
$4,000,000 CJ est. value
Spokane Valley, WA 99216

Sundance Meadows
New Construction, Infrastructure
Conception
$185,000,000 CJ est. value
Nine Mile Falls, WA 99026

Plastic Surgery Northwest Remodel
Addition, Demolition, Build-out, Infrastructure - 5,000 SF
Design
$1,800,000 CJ est. value
Spokane, WA 99202

Spokane Airport Board Unit Price Airside Pavement Rehabilitation
Term Contract
Post-Bid
Spokane, WA 99224

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Last Updated 04/24/2023 04:04 AM
Project Title

US 395 NSC Spokane River Crossing

Physical Address View project details and contacts
City, State (County) Spokane, WA 99201   (Spokane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $68,633,025 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Constructing two prestressed/post-tensioned concrete girder bridges, sign bridge, moment slab, pedestrian trail system, retaining walls, voided slab spans, steel bow truss bridge, path pier table landing, stairway and platform, earthwork, drainage, concrete and HMA paving, planting, guardrail, illumination, curbing, pavement markings, traffic control and other work. Involves 550 working days and 175 items. As of September 13, 2022, this project is in Final Planning status. Preliminary engineering has begun and environmental design is expected to be complete in the third quarter of 2022. The contract advertisement is expected in fourth quarter of 2022 and construction is anticipated to be operationally complete in the fourth quarter of 2025. Estimated value Over $50,000,000 A state funded project with a 5% condition of award small business enterprise goal and a 3% condition of award veteran owned business goal. WSDOT - US 395 NSC Spokane River Crossing Contract No- 000000 This Contract provides for the improvement of *** US 395, by constructing two prestressed/post-tensioned concrete girder bridges, sign bridge, moment slab, Pedestrian Trail System, retaining walls, voided slab spans, steel bow truss bridge, truss bridge, path pier table landing, stairway and platform, earthwork, drainage, concrete and HMA paving, planting, guardrail, illumination, traffic control, curbing, pavement markings *** and other work, all in accordance with the attached Contract Plans, these Contract Special Provisions, City of Spokane Special Provisions and Standard Plans, and the Standard Specifications . MBE (10%), WBE (6%), SBE (5%) This project shall be physically completed within *** 550 *** working days.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents