Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

FY22 USACE Nashville District Design-Build and Design-Bid-Build Multiple Award Task Order Contract (MATOC)
Term Contract
Design
Nashville, TN 37219

Southern Research Biotech Building
Demolition, New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Birmingham, AL 35203

UAB Express Lot 1 DC Quick-Charge EV Charging Stations
New Construction, Infrastructure
Bidding
$250,000 CJ est. value
Birmingham, AL 35233

Inverness Center Drive Sidewalk Phase I
Infrastructure
Bidding
$400,000 CJ est. value
Hoover, AL 35242

Starbucks (Shell) / Trussville
New Construction, Infrastructure - 2,500 SF
Sub-Bidding
$650,000 CJ est. value
Trussville, AL 35173

2023 On Call Sewer Services
Term Contract
Sub-Bidding
Birmingham, AL 35233

Installation of Water Mains and Appurtenances along Glen Iris Park
Post-Bid
Birmingham, AL 35205

Installation of Water Mains and Appurtenances and 92 Water Services
Post-Bid
Homewood, AL

Ruffner Park Revitalization Phase I
Infrastructure
Results
Irondale, AL 35210

Installation of Water Mains and Appurtenances Connected there to and 71 Water Services
Infrastructure
Results
$647,315 est. value
Birmingham, AL 35211

Parkside Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Birmingham, AL 35233

Oteys Tavern
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Homewood, AL 35209

Samford University Recreation Center and Athletic Complex
New Construction, Infrastructure - 154,000 SF
Conception
$65,000,000 est. value
Homewood, AL

Last Updated 08/10/2022 11:02 AM
Project Title

Main Campus - Laydown Yard Modifications Project

Physical Address View project details and contacts
City, State (County) Birmingham, AL 35233   (Jefferson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $270,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of, but is not limited to, "Laydown Yard Modifications, placing new 8-inch compacted ALDOT 825B crushed aggregate, underground pipe installation, concrete ramp, concrete slab on grade, and installation of new bollards" and other miscellaneous associated items as necessary to complete the Work at BWWB Main Campus located in the City of Birmingham, Alabama. Bids shall be based on unit price items and lump sum items as indicated on the Bid Form. Company check or Certified check for documents shall be made payable to The Water Works Board of the City of Birmingham, 3600 First Avenue North, Birmingham, Alabama, 35222 and mailed to the Attn: Ms. Hattye McCarroll. P.E.; Chief Engineer. No additional charge will be made for delivery via UPS ground. Those requesting shipment of documents via carriers other than UPS ground will be made at the requesting firm's expense. Partial sets of Bidding Documents will not be available to any Bidder. Neither the OWNER nor the ENGINEER will be responsible for full or partial sets of Bidding Documents, including any addenda, obtained from other sources. No Bidder may withdraw or alter his bid within sixty (60) calendar days after the actual date of the Bid Opening. The purpose of the Pre-Bid Conference is to raise questions pertaining to the Bidding Documents and Contract Documents and for the OWNER or its representatives to clarify any points. Bids will NOT BE ACCEPTED from any Prospective Bidder who does not attend the Pre-Bid Conference and site visit. All Prospective Bidders shall complete and submit the HUB Bid Solicitation Notice (HUB Form 3) no later than one (1) day after the scheduled date of the pre-bid conference (NO EXCEPTIONS). HUB Program Acknowledgement (HUB Form 1), HUB Compliance Form (HUB Form 2), HUB Subcontractor Performance Form (HUB Form 5) and HUB Subcontractor Utilization Form (HUB Form 6) of Section 00451 HUB Program must be submitted at the Bid Opening as shown above. Each bid shall be accompanied by a cashier's check, drawn on an Alabama Bank, or Bid Bond in the amount of five percent (5%) of the bid not to exceed $10,000.00 in the form and subject to conditions provided for in the Specifications. The Successful Bidder will be required to furnish a Performance Bond and a Labor & Material Payment Bond each in an amount equal to one hundred percent (100%) of the Contract Award. Bidders shall comply with all statutory requirements in accordance with the Instruction to Bidders. Bids will only be received from Contractors who are licensed by the State of Alabama. Contract time of commencement and completion will be in accordance with the Agreement. The Water Works Board of the City of Birmingham ("BWWB") has adopted a voluntary Historically Underutilized Business ("HUB") Program designed to encourage the participation of HUB firms in construction projects. To that end, the BWWB will never exclude any firm from participation in, deny any person benefits of, or otherwise discriminate in connection with the award and performance of BWWB contracts based on racial, gender, social, or economic status. It is the intent of the BWWB to foster competition among contractors, suppliers and vendors that will result in better quality and more economical services for the BWWB. Under this program, the BWWB has established a goal of 30% participation of HUB firms for services required for BWWB construction projects. The BWWB's stated goal will not be the determining factor in construction contract awards; rather bidders must demonstrate compliance with the Good Faith Efforts, more particularly outlined in the HUB Program, toward meeting said goal. Failure on the part of a bidder to fully submit the information required herein may be considered by the BWWB in evaluating whether the bidder is responsive to bid requirements. Alabama Code 31-13-9 (1975) provides that as a condition for the award of any contract by The Water Works Board of the City of Birmingham, a business entity or employer that employs one or more employees within the state of Alabama shall provide documentation of enrollment in the E-Verify program. Each Prospective Bidder must complete, as a condition for the award of any Contract by The Water Works Board of the City of Birmingham, the Certification Regarding Debarment in Section 00201. The Certification must be complete in its entirety and must be included with the Prospective Bidder's Bid (NO EXCEPTIONS). Legislature of Alabama Act 2013-205 grants the Alabama Department of Revenue (ADOR) the authority to issue certificates of exemption from sales and use taxes for construction projects for certain governmental agencies. Pursuant to Act 2013-205, Section 1(g) the Contractor accounts for the sales tax not included in the Bid Form by submitting an Accounting of Sales Tax-Attachment to BWWB Bid Form. Failure to provide an accounting of sales tax shall render the bid non-responsive. Other than determining responsiveness, sales tax accounting shall not affect the bid pricing nor be considered in the determination of the lowest responsible and responsive bidder. After Notice of Award, Contractor and Subcontractor licensed by the State Licensing Board for General Contractors must comply with ADOR requirements for making application for qualification of the exemption and are responsible for ADOR reporting requirements for the duration of the project. If a Contract is to be awarded, it will be awarded to the lowest responsive and responsible Bidder, who has neither been disqualified nor rejected pursuant to these Contract Documents, and whose Bid based on an evaluation by the OWNER indicates that the award will be in the best interest of the Project and will result in the lowest overall cost to the OWNER for completion of the project. If a Contract is to be awarded, it will be awarded within 30 calendar days after the day of the opening of bids. The OWNER reserves the right to reject any and all proposals, the right to waive irregularities or to accept any proposal deemed to be in the best interest of the OWNER.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Culverts.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents