Similar Projects
Scour Repair and Stabilizing Channel and Banks
Infrastructure
Bidding
$37,538 to $45,880 est. value
Moulton, AL

Swedetown Road - RRR and Drainage Improvements
Infrastructure
Bidding
Theodore, AL 36582

Grassing/Site Work at Longleaf Drive Pasture Site
Post-Bid
Auburn, AL

Pike Park Recreational Improvements
Post-Bid
Lincoln, AL 35096

McDuffie Bulkhead Replacement
Results
Mobile, AL

Design-Bid-Build Walter F. George (WFG) Long Term Riprap Repair - Walter F. George Dam, Chattahoochee River, AL and GA
Results
$25,000,000 to $100,000,000 est. value
AL

Regal Street Drainage and Roadway Improvement Project
Infrastructure
Bidding
Winfield, AL 35594

Buckhead Drainage Way Clean-Up
Post-Bid
Northport, AL

Point Aux Pins Living Shoreline Restoration at Alabama Department of Conservation and Natural Resources
Results
Foley, AL

Resurfacing and Drainage Repair
Infrastructure
Bidding
Slocomb, AL

Grade, Drain, Base and Pave to extend an Industrial Park Access Road off SR-129 for 1,700 Ft
Post-Bid
$500,000 to $600,000 est. value
Winfield, AL 35594

MA - Roadway Pipe
Term Contract
Results
Montgomery, AL 36130

Cypress Creek Drainage Improvements Construction Phase I
Infrastructure
Bidding
Tuscaloosa, AL

56 Freda Jane Lane Drainage Improvements
Post-Bid
Birmingham, AL 35215

Gulley Repair on County Road 55 East of Tumbleton
Results
$140,000 to $170,000 est. value
Abbeville, AL 36310

Reported 06/23/2021 12:00 AM
Project Title

Pinedale Elementary School - Erosion Control Enterprise City Schools

Physical Address View project details and contacts
City, State (County) Enterprise, AL 36330   (Coffee County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work to include the removal of existing sidewalk, topsoil & trees, importing of engineered fill, installation of roof drain system, retaining wall, concrete sidewalk and stairs, and final stabilization of new slope at the existing Pinedale Elementary School. All of this work will include erosion & sedimentation control, storm drainage, and finished grading.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents