Similar Projects
South Park Trail Phase 2 and Parking Improvements
Bidding
Elyria, OH

South Park Trail Phase 2 and Parking Improvements
Bidding
Elyria, OH

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Akron, Athens, Avon, Bellefontaine, Cincinnati, Columbus, Defiance, Huber Heights, Kent, Marietta, Mason, Saint Clairsville, Sidney, Wadsworth, Wheelersburg, Xenia, Youngstown, OH

S.R.83–South Avon Beldon Road Widening
Post-Bid
$228,650 est. value
Avon, OH

Elyria East Park Trail Improvement
Results
Elyria, OH 44035

Street Patching within the City of Lorain
Results
Lorain, OH 44052

Wenner Street Improvement Project
Bidding
Wellington, OH

Paving Various Columbia Township Roads
Post-Bid
Columbia Station, OH

LOR - Black River Bikeway Extension -Phase 4E
Results
Less than $1,750,000 est. value
Elyria, OH 44035

Spot Patching / Pavement Repair - LOR/MED RM FY2021
Bidding

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Grafton Chestnut Street Improvement Phase 2
Results
Less than $926,690 est. value
Grafton, OH 44044

Crack and Joint Sealant (MBE Only)
Term Contract
Bidding

Hawthorne and Colony Drive Pavement Improvements
Post-Bid
Oberlin, OH

Ranger Way Extension
Results
$1,465,100 est. value
North Ridgeville, OH 44039

Last Updated 04/29/2021 02:59 PM
Project Title

2021 Paving Improvements

Physical Address View project details and contacts
City, State (County) North Ridgeville, OH 44039   (Lorain County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $120,000 to $140,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work Covered by the Contract Documents includes resurfacing of an asphalt parking lot and driveway at the North Ridgeville High School. The project locations are as follows: Bus driver`s parking lot east of North Ridgeville High School and the quarter-loop driveway off of Bainbridge Road.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents