Similar Projects
Site Excavation
Infrastructure
Post-Bid
$100,000 est. value
Wheaton, MO

1.3 miles of Double Chip and Seal
Infrastructure
Post-Bid
$370,000 est. value
Verona, MO 65769

Cassville Public Works
New Construction, Infrastructure
Results
$2,374,000 CJ est. value
Cassville, MO 65625

The Childrens Center of Southwest Missouri - Monett - Addition and Renovation
Addition, Infrastructure, Renovation - 3,751 SF
Pending Verification
$200,000 CJ est. value
Monett, MO 65708

The Childrens Center of Southwest Missouri - Monett - Addition and Renovation
Addition, Infrastructure, Renovation - 3,751 SF
Pending Verification
$200,000 CJ est. value
Monett, MO 65708

Transportation Facility
New Construction, Infrastructure - 3,600 SF
Post-Bid
$1,000,000 CJ est. value
Purdy, MO 65734

Various Excavating Projects
Infrastructure
Post-Bid
$50,000 CJ est. value
Purdy, MO 65734

Wheaton R-III School District Cafeteria Tornado Shelter Bid Package B
New Construction, Infrastructure
Post-Bid
$530,000 CJ est. value
Wheaton, MO 64874

Asphalt Resurfacing and Related Services on City Streets and Facilities
Infrastructure
Post-Bid
$200,000 CJ est. value
Cassville, MO 65625

Highway 86 Road & Intersection Improvements
Renovation, Infrastructure
Post-Bid
Cassville, MO 65625

Dollar General #25870 / Golden
New Construction, Infrastructure - 10,753 SF
Post-Bid
$2,000,000 CJ est. value
Golden, MO 65658

Cassville Performing Arts Center
Infrastructure, Renovation
Post-Bid
$10,000,000 CJ est. value
Cassville, MO 65625

Barry County Bridge Replacement on FR 1162
Infrastructure
Post-Bid
$300,000 CJ est. value
Roaring River Township, MO 65641

Irrigation Pump and Motor
Infrastructure
Post-Bid
$120,000 CJ est. value
Washburn, MO 65772

Residential Trash Pick-up
Infrastructure
Post-Bid
$100,000 CJ est. value
Washburn, MO 65772

Last Updated 10/09/2023 12:04 AM
Project Title

Resurface

Physical Address View project details and contacts
City, State (County) Cassville, MO 65625   (Barry County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J7P3437 Route Bus 37 BARRY County. Resurface from Route 37 to Route 76 in Cassville, the total length of improvement being 3.404 miles. (2): Job J7S3447 Route 76 BARRY, MCDONALD County. Resurface from Route U to Route 37 in Cassville, the total length of improvement being 16.618 miles. Range: 2.5M to 5M Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. MODOT - G02 - Resurface *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. FEDERAL PROJECT NUMBER(S): FAS S603(90), FAS S604(21)

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents