Similar Projects
Joshua Tree National Park Improvements
Renovation, Addition - 11,000 SF
Conception
Joshua Tree, CA

Lankershim Hotel
New Construction, Demolition - 108,841 SF
Conception
$10,000,000 CJ est. value
Los Angeles, CA 91601

New Provosts Office at Salazar Hall
New Construction - 6,200 SF
Design
Rohnert Park, CA 94928

United States Geological Survey (USGS) Moffett Field Building 19
Term Contract, Renovation, Infrastructure - 55,000 SF
Design
$10,000,000 CJ est. value
Mountain View, CA 94043

Boardroom Multimedia Replacement Project
Renovation
Bidding
$350,000 CJ est. value
Independence, CA 93526

Temporary Emergency Housing Project on Arbor Avenue, Site Improvements Construction Package 2 - Rebid
Infrastructure, Renovation
Bidding
$12,330,815 CJ est. value
Tracy, CA 95304

Needed Project Controls and Construction Management Services No 1
New Construction, Infrastructure
Post-Bid
$3,000,000 est. value
San Francisco, CA

Job Order Contracts 2021
Renovation
Post-Bid
CA

Creekside and Meadowbrook Group Area Renovation at Vasona Lake County Park
Renovation
Results
$924,206 est. value
Los Gatos, CA 95032

General Building Job Order Contracting
New Construction, Term Contract
Results
Less than $3,000,000 est. value
CA

Studio 2000
New Construction, Demolition - 43,567 SF
Construction
$10,000,000 est. value
Berkeley, CA 94704

Saint Ignatius College Academic Building
New Construction, Demolition
Pending Verification
San Francisco, CA 94116

939-943 35th St. - West Oakland
New Construction, Demolition
Pending Verification
Oakland, CA 94608

2929 Broadway Mixed-Use Development
New Construction, Demolition - 222,820 SF
Conception
$10,000,000 CJ est. value
Oakland, CA

CIP 689 Clark Building Renovations - 301-8689-4201 - City Of Hermosa Beach
Renovation
Design
Hermosa Beach, CA 90254

Last Updated 09/15/2022 07:03 PM
Project Title

Child Support Service Department - Post Move - Office Improvements - San Benito County

Physical Address View project details and contacts
City, State (County) Hollister, CA 95023   (San Benito County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $260,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Child Support Department Office improvements to support operations and new space management and necessary layout, including interview room, fire safety upgrades. Project is included in the San Benito County's FY 2021-2025 CIP. As of September 15, 2022, information regarding a design team and a general contractor is not available. A timeline for construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents