Project Title | Loyalhanna Dam Service Bridge Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Saltsburg, PA 15681 (Indiana County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 to $5,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work consists of removal and replacement of the concrete slabs over Gate Bay 5, installation of a concrete overlay at Monolith 6 and Pier 7, installation of Carbon Fiber Reinforced Polymer (CFRP) on the bottom of the concrete t-beams at Work Bay 5, installation of Glass Fiber Reinforced Polymer (GFRP) on the top of the slab at Work Bay 5, miscellaneous concrete repairs at Pier 7 and at the right abutment, sealing the concrete deck joints, and cleaning and repainting the steel girders and bracing members over Gate Bay 5. It is anticipated that the steel members above Gate Bay 5 contain lead-based paint. Disposal of concrete rubble will be required. Lead-based paint abatement will be required. Ferrous and other construction waste material will be disposed at a commercially permitted facility licensed to accept the waste or recycled if applicable. Construction work will occur in close proximity to operating dam gates. Loyalhanna Dam operates 24 hours a day, 7 days a week. | ||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |