Similar Projects
Herbert Wertheim Laboratory for Engineering Excellence (Nuclear Science Bid)
New Construction - 75,000 SF
Post-Bid
Gainesville, FL 32611

UF IT Move / Phase I: Building 800 2nd Floor Build Out / Phase II Building 720 Renovation
Renovation
Post-Bid
Gainesville, FL

PK Yonge Phase II - CM-At-Risk
- 75,000 SF
Results
Less than $3,843,708 est. value
Gainesville, FL

Data Science and Information Technology - CM-At-Risk
- 260,000 SF
Results
Less than $135,000,000 est. value
Gainesville, FL

UF-394 PK Yonge Phase II Middle and High School Expansion
Construction
Gainesville, FL

Florida Gymnasium Lecture Hall Renovations
Renovation
Construction
Gainesville, FL 32653

UF Library West 2nd Floor Renovation
Renovation
Post-Bid
Gainesville, FL

Bruton-Geer Second Floor Renovations
Renovation
Results
Gainesville, FL

Basic Science Building - 1st Floor Renovation (Main Campus)
Renovation
Construction
Less than $2,850,000 est. value
Gainesville, FL 326115050

Bruton Geer Exp.Learning Hub Renovation
Renovation
Post-Bid
Gainesville, FL

IFAS Horticulture Garden Facility
Results
Gainesville, FL

UF Broward Hall, Building 0011 Renovation
Renovation
Construction
Gainesville, FL

Smathers East Library - Repairs in Judaica Suite Envelope
Post-Bid
Gainesville, FL

University of Florida Steam Manhole
Results
Gainesville, FL

Music Building Renovation
Renovation
Post-Bid
Less than $4,900,000 est. value
Gainesville, FL

Last Updated 02/07/2019 02:30 PM
Project Title

Y Building Learning Commons Renovation Remodel

Physical Address View project details and contacts
City, State (County) Gainesville, FL   (Alachua County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method
Project Status Construction Commenced December 2018, Construction Completion Expected July 2019, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Renovation and remodel of the 1st and 2nd floors of Y Building on the NW Campus to incorporate a Learning Commons into the existing Library. Work includes cutting and patching, demolition, metal fabrication, rough and finish carpentry, casework, blanket insulation, joint protection, wood and metal doors and frames, aluminum-framed entrances and storefronts, folding glass storefronts, door hardware, glazing, gypsum board assemblies, non-structural metal framing, acoustical panel ceilings, resilient flooring accessories, resilient tile flooring, carpet tile, tackable wallcovering, painting and coating, and lockers and modifications to the Mechanical, Electrical, and Fire Protection systems.
Details
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents