Similar Projects
Broad Street Sidewalk Repair
Post-Bid
Chattanooga, TN 37402

Pioneer Frontier Park - Playground/Splashpad Equipment Installation
Post-Bid
East Ridge, TN 37412

Concrete Pathway Installation, Landscaping, Storm Water Structure Modifications, Irrigation System, L.E.D. Pedestrian Lighting, Installation of ADA Compliant Crossing Ramps, Railroad Safety Improvements
Results
Chattanooga, TN

Enterprise South Nature Park Cycling Trail
Results
Chattanooga, TN 37400

Normal Park Upper Football Field Improvements
Post-Bid
Chattanooga, TN 37405

Resurfacing Tennis Courts at Champions Club
Results
Chattanooga, TN 37351

Howard High School Softball Field Improvements
Infrastructure
Post-Bid
Chattanooga, TN 37408

Dogwood Manor Parking Lot Repair
Infrastructure
Results
Chattanooga, TN 37402

Warner Park Splash Pad Shade Structure
Term Contract, Alteration
Post-Bid
Chattanooga, TN

RTP Walking Track Improvements
Infrastructure
Results
$160,000 est. value
Harrison, TN

UTC Divine Nine Heritage Park
New Construction
Post-Bid
$250,000 est. value
Chattanooga, TN

Hardy Street Extension
Infrastructure
Results
Chattanooga, TN 37406

Playground Equipment
Alteration
Post-Bid
Red Bank, TN

Athletic Field Improvements
Renovation
Post-Bid
Chattanooga, TN 37421

Sidewalks Panel Replacements and ADA Ramps Blanket Contract
Term Contract, Infrastructure
Post-Bid
Chattanooga, TN

Last Updated 07/21/2022 12:34 AM
Project Title

2022 Greenway Installation Little Debbie Parkway and Veterans Memorial Park

Physical Address View project details and contacts
City, State (County) Collegedale, TN   (Hamilton County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For the installation of approximately 15,000 square feet of a six (6) to ten (10) foot wide concrete greenway sidewalk at locations further identified in these contract specifications. Incidental work shall include, but not be limited to, pedestrian safety railings, retaining walls and drainage modifications. This is an estimated amount, and final quantities may differ. The City reserves the right to increase or decrease the quantities specified. The project covers the site preparation, forming and installation of a concrete greenway sidewalk and other miscellaneous construction as shown on the plans attached to these specifications. Work includes, but is not limited to, the following: 1. Site preparation/excavation 2. Installation of retaining walls where required 3. Removal and installation of various drainage infrastructure 4. Installation of 5" thick concrete sidewalk 5. Construction of ADA ramps 6. Installation of long-life thermoplastic striping Bidders must comply with all Local, State and Federal requirements for bidding, construction or installation of the work

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents