Similar Projects
Broadmoor Boulevard Extension Phase II R/W (Northern Boulevard to PDV) - City of Rio Rancho
Infrastructure
Conception
$2,650,730 CJ est. value
Rio Rancho, NM 87124

13 Judicial Complex Expansion - 38529 - Sandoval County
Addition, Demolition, Infrastructure
Conception
$11,288,000 CJ est. value
Bernalillo, NM 87004

Roadrunner Storage
New Construction, Infrastructure - 100,000 SF
Design
$5,000,000 CJ est. value
Rio Rancho, NM 87124

Tulip Townhomes
New Construction, Infrastructure
Design
$12,100,000 CJ est. value
Rio Rancho, NM 87124

Edith Murray Community Center
New Construction, Infrastructure - 3,000 SF
Bidding
$103,000 CJ est. value
San Ysidro, NM 87053

County Road 11 - Bridge Replacements - Bridges 1784 and 1786
Demolition, New Construction, Infrastructure
Bidding
$1,042,000 CJ est. value
Cuba, NM 87013

Ranchitos Lift Station
New Construction
Post-Bid
Santa Ana Pueblo, NM

RFQ Contractor - El Vado Dam Spillways and Dam Crest Modification Project
Infrastructure
Post-Bid
$86,000,000 CJ est. value
Tierra Amarilla, NM 87575

World-Wide Water Storage Tank Remediation
Term Contract
Results

Old Highway 44 Roadway and Bridge Reconstruction
Demolition, New Construction, Infrastructure
Results
$2,784,573 CJ est. value
Bernalillo, NM 87004

Deluxe Design Expansion
Addition, Infrastructure, Renovation
Construction
$1,300,000 CJ est. value
Rio Rancho, NM 87144

Melon Ridge
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Rio Rancho, NM 87124

Iris Road Drainage Improvements - City of Rio Rancho
Infrastructure
Conception
$1,700,000 CJ est. value
Rio Rancho, NM 87144

Well 13R Equipping and Site Improvements
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Rio Rancho, NM 87124

Construction of New 3 MG Steel Water Tank at Well 9
Infrastructure
Results
$2,700,000 est. value
Rio Rancho, NM 87144

Last Updated 10/18/2022 02:35 AM
Project Title

New Tank at Well 12 - City of Rio Rancho

Physical Address View project details and contacts
City, State (County) Rio Rancho, NM 87144   (Sandoval County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected July 2025
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New Tank at Well 12. 2nd tank at Well 12 will allow an easier rehabilitation of existing Tank 12. The total project should cost around $3 million to $4 million dollars. Engineering 2028 Construction 2029. Tank 12 is part of the trunk line system serving the Enchanted Hills Region. This project is in included in the City's or County's FY 2023-2029 Capital Improvement Plan (CIP). As of October 18, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents