Similar Projects
Airport Landside Terminal Parking Lot - City of Auburn
Infrastructure
Conception
$250,000 CJ est. value
Auburn, ME 04210

Construct Corporate Hangar - City of Auburn
New Construction, Infrastructure
Conception
$975,000 CJ est. value
Auburn, ME 04210

Picker House Lofts
Infrastructure, Renovation
Design
$22,400,000 CJ est. value
Lewiston, ME 04240

Brickyard Commons - Auburn
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Auburn, ME 04210

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

2023 Crack Sealing of Asphalt Bituminous Pavement
Infrastructure
Bidding
$100,000 CJ est. value
Lewiston, ME 04240

Paving and Catch Basin Improvements at Family Development
Infrastructure
Post-Bid
$1,500,000 CJ est. value
Auburn, ME 04210

Paving and Catch Basin Improvements at Family Development
Infrastructure
Post-Bid
$1,500,000 CJ est. value
Auburn, ME 04210

Statewide Geotechnical Drilling
Infrastructure
Results

Fairlawn Avenue Water Main Replacement and Road Rehab
Infrastructure
Results
Lewiston, ME 04240

Walgreens - Main Street / Lewiston
New Construction, Infrastructure - 3,834 SF
Pending Verification
$825,000 CJ est. value
Lewiston, ME 04240

Strawberry Avenue Self-Storage
New Construction, Infrastructure - 28,400 SF
Pending Verification
$3,000,000 CJ est. value
Lewiston, ME 04240

Airport Landside (Auto) Terminal Parking Lot Reconstruct Landside - City of Lewiston
Infrastructure
Conception
$1,800,000 CJ est. value
Auburn, ME 04210

Haley Street, Warren Ave, and Webber Ave Water Main Replacement
Infrastructure
Bidding
$800,000 CJ est. value
Lewiston, ME 04240

2023 Double Tennis Court Reconstruction Project
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Auburn, ME 04210

Last Updated 03/20/2023 03:05 AM
Project Title

Redundant Water Transmission Main Installation - City of Lewiston

Physical Address View project details and contacts
City, State (County) Lewiston, ME 04241   (Androscoggin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $5,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Engineering for this project is underway and is at the preliminary design phase. The project would include a new water transmission main from the lake to Main Street Pumping Station (or where ever the pumping station is located) with a new river crossing at the Auburn Boat Launch to Avon Street in Lewiston. Phase 1 would be to construct a new main on North River Road in Auburn from Center Street to the new river crossing. Phase 2 is the river crossing by directional drilling or dredging. Phase 3 is a new 24-inch main from Avon Street to the Main Street. Phase 4 is new transmission main on Main Street from Bates Street to the Main Street Pump Station. A new pump station near or on Avon Street would be feasible if the existing Main Street Pump Station ever needs to be replaced or moved. The last phase that is not included in this LCIP is to install a second transmission main from the lake to the river crossing. Costs shown here are high ranges for the various phases since the design process has not refined the alternatives, and for now are simply prorated. As March 20, 2023, this project is currently in the FY 2024 - 2028 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents