Similar Projects
Solid Waste, Recyclables, and Bulk Waste Collection and Disposal Franchise Agreement
Term Contract
Bidding
Southwest Ranches, FL

Pre-Event Cut and Toss
Infrastructure
Bidding

Palm Frond Collection Services - Las Olas Isles
Term Contract
Post-Bid
$72,500 to $88,000 est. value
Fort Lauderdale, FL 33301

Pre-Event Emergency Cut and Toss
Post-Bid

Solid Waste Services
Term Contract
Results
North Lauderdale, FL

Disaster Debris Monitoring Services
Results
Lauderhill, FL

Hurricane Debris Clearing / Removal
Infrastructure
Bidding
West Park, FL

Contaminated Soil Disposal
Post-Bid
Pompano Beach, FL 33069

Recycling, Collection, Processing and Disposal Services
Infrastructure
Results
Southwest Ranches, FL

Garbage and Recycling Collection Services
Term Contract
Post-Bid
Margate, FL

Sewer Lift Stations Wet Wells and Valve Box Cleaning
Term Contract
Results
Miramar, FL 33027

Solid Waste, Recycling, HHW, Bulk and Yard Waste Collection Services
Term Contract
Post-Bid
Pembroke Pines, FL

Contractor Demolition and Disposal Single Family Residence - 6411 SW 16 Court
Demolition, Infrastructure
Results
Pompano Beach, FL 33068

Recycling Services
Term Contract
Post-Bid
FL

Hauling and Disposal of Sand, Rags and Grit from Aeration Basin 3 at Wastewater Reclamation Facility
Infrastructure
Results
Miramar, FL 33027

Reported 04/29/2022 12:00 AM
Project Title

GTL Removal and Haul Grit Inside Confined Space SHTs

Physical Address View project details and contacts
City, State (County) Fort Lauderdale, FL   (Broward County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $85,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Annual maintenance at the GTL WWTP. GTL has 2 circular tanks of approximate diameter 60-feet. Each tank has a sloped, conical bottom of approximate depth of 5-feet at the center. The sediment volume in each tank is estimated to be between 100-140 CY. Entry into each tank is through a 24-inch manway approximately 2 feet above grade. The GTL facility will provide confined space air quality monitoring, ventilation, electrical outlets, use of facility restrooms and washdown hoses. Contractor to provide all equipment to remove all grit, sand, and rags and transport and dispose of material at a permitted facility. Perform washdown of sidewalls up to 10 feet when removing debris to ensure tanks are empty.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents