Similar Projects
SR4006 ov Porter Creek
New Construction, Infrastructure
Bidding
PA

Replace Two Culverts-Beam Road
Infrastructure
Bidding
PA

Washington Mill/Distillery Drainage and Improved Access Project
Post-Bid
Perryopolis, PA 15473

Fayette County Courthouse Retaining Wall
Post-Bid
Uniontown, PA 15401

Mchenry Road Culvert Project
Results
Benton, PA 17814

Weidner Road Culvert
Results
Boyertown, PA 19512

Green Valley Road Streambank Stabilization
Infrastructure
Bidding
$25,000 est. value
York, PA

Mass Earthwork Plan - South Fayette Municipal Complex Project - Phase 1
Post-Bid
Bridgeville, PA 15017

Bldg 633 Flood Prevention Repairs, Naval Surface Warfare Center Philadelphia Division, Philadelphia, PA
Results
$25,000 to $100,000 est. value
Philadelphia, PA

Levee Rehabilitation Project
Post-Bid
PA

Upper Julian Pike and Rose Drive Culvert Replacements Project
Results
$55,000 to $75,000 est. value
Patton, PA 16803

Riverview Avenue Slope Repair
Post-Bid
Pittsburgh, PA 15214

Low Dutch Road Culvert Replacement Project
Results
Less than $121,440 est. value
Gettysburg, PA 17325

Corrugated Metal Pipe
Post-Bid
Carnegie, PA

Drainage and Base Improvements on Lentz Road
Results
Marion Center, PA 15759

Last Updated 01/26/2022 11:14 AM
Project Title

210 Gulph Creek Road Stream Bank Stabilization

Physical Address View project details and contacts
City, State (County) Wayne, PA 19087   (Delaware County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The demolition of approximately 20 linear feet of the existing stone wall along the stream to the rear of the subject parcel to accommodate the proposed gravity wall extension, construction of approximately 20 linear feet of a gravity retaining wall as an extension of the wall previously installed along the stream to the rear of the subject parcel, installation of rip rap at the toe of the existing retaining wall along the stream, installation of rip rap bank protection in the areas noted on the plans including supplementing the rip rap which was previously installed at the southern corner of the subject parcel, and complete all required pavement, vegetative removals/restoration, fence removal/replacement, and incidentals.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents