Similar Projects
Project Green
New Construction, Infrastructure - 673,000 SF
Conception
$361,000,000 CJ est. value
Fort Wayne, IN 46809

Tiburon/Livingston Lakes Extended
New Construction, Infrastructure
Design
Fort Wayne, IN 46818

Hunters Development
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fort Wayne, IN 46845

2023 CPP Site Improvement Projects
Infrastructure
Bidding
$500,000 CJ est. value
Fort Wayne, IN 46802

2023 Build-Learn-Grow Pre-K Accessibility Project
Infrastructure
Bidding
$125,000 CJ est. value
Fort Wayne, IN 46802

RFQ - Franke Park Renaissance Project Phase 1
Renovation, Infrastructure
Sub-Bidding
$16,755,000 CJ est. value
Fort Wayne, IN 46808

2021 Pavement and Site Improvements
Infrastructure
Post-Bid
Fort Wayne, IN

On-Call Construction Services
Infrastructure
Post-Bid
Fort Wayne, IN

Abandoned Coal Mine Restoration
Results
$150,000 est. value

Demolition and Lot Restoration for Neighborhood Code
Infrastructure
Results
Fort Wayne, IN

RFP Design Architectural and Engineering Services for the Expansion and Renovation of Levan R. Scott Academy
Addition, Renovation, Infrastructure
Pending Verification
$670,000 CJ est. value
Fort Wayne, IN 46806

Isabelle Gardens
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Fort Wayne, IN 46805

Premier Riverfront Property
New Construction, Infrastructure - 60,000 SF
Design
$70,000,000 CJ est. value
Fort Wayne, IN 46802

Road Reconstruction
Infrastructure
Bidding
$1,150,000 CJ est. value
Fort Wayne, IN 46818

FWCS Wayne HS - Bid Package 2 Building and Sitework
Renovation, Infrastructure - 318,613 SF
Post-Bid
$46,000,000 est. value
Fort Wayne, IN 46895

Last Updated 11/16/2022 02:05 AM
Project Title

Water Pollution Control Plant (WPCP) Pond 3 Bleedback Improvements - Phase II

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46802   (Allen County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $485,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

installation of automated gate actuators to existing gates, sampling equipment, lighting, and monitoring equipment at the Water Pollution Control Plant Pond 3 Bleedback structure. Improvements also include structural modifications to the static aerator structure and outfall structure along with installation of additional monitoring devices at those structures. Fort Wayne City Utilities is inviting you to a scheduled Zoom meeting. Join Zoom Meeting https://us02web.zoom.us/j/89980058950pwd=elVVdzhmaEE5VkJBS2hydlJQazlZQT09 Meeting ID: 899 8005 8950 Passcode: 996047 One tap mobile +13017158592,,89980058950#,,,,*996047# US (Washington DC) +13092053325,,89980058950#,,,,*996047# US Dial by your location +1 301 715 8592 US (Washington DC) +1 309 205 3325 US +1 312 626 6799 US (Chicago) +1 646 931 3860 US +1 929 205 6099 US (New York) +1 386 347 5053 US +1 564 217 2000 US +1 669 444 9171 US +1 669 900 6833 US (San Jose) +1 719 359 4580 US +1 253 215 8782 US (Tacoma) +1 346 248 7799 US (Houston) Meeting ID: 899 8005 8950 Passcode: 996047 Find your local number: https://us02web.zoom.us/u/kbyffHGX6

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents