Similar Projects
Facade Improvement Grant Program
Post-Bid
Saint Petersburg, FL 33711

Facade Improvement Grant Program
Post-Bid
Saint Petersburg, FL 33712

Facade Improvement Grant Program
Results
Saint Petersburg, FL 33705

Facade Improvement Grant Program
Results
Saint Petersburg, FL 33712

Facade Improvement Grant Program
Alteration
Post-Bid
Saint Petersburg, FL 33712

Facade Improvement, Residential Homes
Alteration
Results
Saint Petersburg, FL 33712

Flagpole Replacement at Fred Howard Park
Alteration
Post-Bid
Tarpon Springs, FL 34689

Facade Improvement, Residential Homes
Alteration
Results
Saint Petersburg, FL 33711

Disston Stairs Remediation
Term Contract, Alteration
Post-Bid
Saint Petersburg, FL 33709

Tuck Pointing and Exterior Repairs
Alteration
Results
$2,600,000 est. value
Clearwater, FL 33761

Flag Pole Replacement at Fred Howard Park
Alteration
Post-Bid
Tarpon Springs, FL 34689

Facade Improvement, Residential Homes
Alteration
Results
Saint Petersburg, FL 33711

Truss Structure Rentals
Alteration
Post-Bid
Clearwater, FL

Facade Improvement, Residential Homes
Alteration
Results
Saint Petersburg, FL 33712

Guard Rail Installation System at South Cross
Alteration
Post-Bid
Kenneth City, FL 33709

Last Updated 02/22/2022 09:09 AM
Project Title

Relocatable Classrooms Exterior Renovations and Repairs

Physical Address View project details and contacts
City, State (County) FL   (Pinellas County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide labor to re-do the T111 siding on portable classrooms throughout the district. The Contractor will need to remove the door, the windows and either the ramp or the step to do this work. All Pinellas County Schools portables are 24 x 36. We will be removing the T111 siding down to the 2x framing and also replace any and all damaged 2x framing members. Various classroom portables will need repairs around the door openings. Replace any tie down strapping that is needed. Install new Tyvek to the exterior walls, cutting and folding into window and door openings. Install new T111 siding while cutting out for the windows and door. All nailing of the T111 siding onto the framing will require a #8 ring shank galvanized nails. Install new windows including taping the nail flange and trim them out with 1x4 on the outside and ¾ quarter round on the inside. Re install door, jams including threshold and closer making sure that the door is closing properly. Install corner trim as needed and fill all nail holes with caulk. The grounds will be returned to the original condition and daily cleanup of each site is mandatory. This work shall be completed by a Florida licensed Residential Contractor.

Details

Division 05 - Metals, Steel Joist Framing.
Division 07 - Thermal and Moisture Protection, Siding.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents