Similar Projects
SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

C-478 Resurfacing form SR 471 to Center Hill
Results
Less than $2,278,700 est. value
FL

Asphalt Repair
Results
Less than $500,000 est. value

Sumter County C-466 Intersection Improvement Phase II
Results
Wildwood, FL 34785

Reconstructing Rest Area
Results
Less than $15,239,698 est. value
FL

Sumter County CR 525E Phase Two Project
Results
Bushnell, FL

Sumter County Deskin Lane South Gate Resurfacing Project
Results
Wildwood, FL 34785

I-75/ Sumter County Asset Maintenance
Results
Less than $14,761,000 est. value
FL

Resurfacing
Results
Less than $8,526,534 est. value
FL

Resurfacing
Results
Less than $13,439,799 est. value
FL

Driveway Apron for Rainbow Lakes Substation
Results
Sumterville, FL

Park Improvements
Results
Coleman, FL

Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Results

Sumter County Powell Road Resurfacing Project
Infrastructure
Results
Wildwood, FL 34785

Sumter County Miscellaneous Roadway Resurfacing Project
Infrastructure
Results
Bushnell, FL

Last Updated 03/02/2022 07:44 AM
Project Title

CR 229 Improvements from SR 44 to C-462

Physical Address View project details and contacts
City, State (County) Wildwood, FL   (Sumter County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,227,300
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of reconstructing CR 229 between SR 44 and County Road 462 (approximately 1.5 miles) via Full Depth Reclamation. Additional right-of-way has been acquired on the east side of the roadway within the noted project limits. The roadway footprint is being shifted eastward so that the roadway will sit centered within the new expanded rightof-way. Currently the roadway facility does not have a defined drainage system. This project will incorporate swale drainage with “swale blocks” installed throughout the project limits. Furthermore, several cross drains are designed within the project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents