Similar Projects
Greenwood Stormwater Basin
Post-Bid
Niles, IL 60714

Grasslands Grading Improvements
Post-Bid
Orland Park, IL

I-19-4476 Roadway and Bridge Widening and Reconstruction
Results
$25,000,000 to $50,000,000 est. value
IL

Terminal Area Fire Main Relocation - Lower Level Utility and Pavement Reconstruction
Results
Chicago, IL

Lincoln Yards South Package A-1 & B
Construction
Chicago, IL 60632

2021 Road Maintenance Program
Post-Bid
Inverness, IL

2021 Crack Routing and Sealing
Results
Hanover Park, IL

Street Resurfacing Program
Renovation
Post-Bid
Mount Prospect, IL

Grand Avenue Improvements
Renovation
Results
Chicago, IL 60600

Site Paving
Post-Bid
Elgin, IL 60120

2021 Street Improvement Program
Results
Less than $464,820 est. value
Morton Grove, IL

2021 Paving Work at Conant, Fremd, Hoffman Estates, Palatine and Schaumburg High Schools
Post-Bid
Palatine, IL

Hart Road and Main Street Water Main Replacement
Results
Less than $563,165 est. value
Barrington, IL

HMA Resurfurfacing
Post-Bid
IL

Pavement Resurfacing
Results
Less than $2,760,387 est. value
Palatine, IL

Reported 07/13/2022 02:54 PM
Project Title

Cedar Lane Reconstruction - Village Of Northbrook

Physical Address View project details and contacts
City, State (County) Northbrook, IL   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Design Development, Construction Start Expected February 2023
Bids Due View project details and contacts
Estimated Value $1,892,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 12, 2022, an engineer has been selected and this project is in the design phase. A firm timeline for bidding and construction has not been determined. The surface layer of pavement on Cedar Lane and Walters Avenue needs to be replaced. Since it was last repaved in 1999, the roadway has begun to exhibit a number of faults and is rated as having limited failures. Roadways rated as having limited failures (3 on a scale of 5) exhibit signs of road surface cracking and have small potholes beginning to form. Examples of these failures include horizontal and longitudinal road surface cracking. In 2021, the Village hired a design consultant to complete Phase II engineering for the reconstruction of Cedar Lane including a new roadway surface and various improvements to the streetscape and parking configuration that improve traffic conditions for motorists, bicyclists, and pedestrians. The Village held Public Information meetings and provided an update to the Village Board who directed staff to look at alternative options. Staff continues to work with the consultant on alternative options. Additional public input and final Board direction will be needed before project schedule and costs are finalized. This project is included in the city's 2023-2027 Capital Improvement Plan (CIP) and funding allotted for 2022/2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents