Similar Projects
Mouth of the Columbia River Sand Island Pile Dikes Repair
Alteration
Design
$25,000,000 to $100,000,000 est. value

Trans Pacific Parkway Drainage Improvement Project
Infrastructure
Bidding
$400,000 est. value
Coos Bay, OR 97420

Kruger Creek Stabilization
Infrastructure
Bidding
$4,150,000 est. value
Tigard, OR

Fairview Creek Pipe Culvert Joint Repair
Infrastructure
Post-Bid
Gresham, OR

Windy Creek Bridge Replacement Reuben Road
New Construction, Infrastructure
Post-Bid
$2,100,000 est. value
Glendale, Roseburg, OR 97442

OR 214 - Johna Ln. - Fenne Ln. (Silverton) Sec. Silver Creek Falls Vidal Francis, Pm
Infrastructure
Results
$500,000 to $1,000,000 est. value
Silverton, OR

ADA Ramps - W Baseline Road
Alteration
Results
$300,000 to $400,000 est. value
OR

Parkway Drive Roadway Improvements
Infrastructure
Bidding
$300,000 est. value
Dunes City, OR 97439

OR42: Frenchie Creek Culvert Project
Infrastructure
Post-Bid
$2,000,000 to $5,000,000 est. value
Bridge, OR 97458

US101: MP 348.45 NB Landslide Mitigation
Infrastructure
Results
OR

Manzanita Transfer Station West Wall Improvements
Infrastructure
Bidding
$283,000 to $361,000 est. value
Manzanita, OR 97130

Schoolhouse Street Improvements
Infrastructure
Post-Bid
Depoe Bay, OR 97341

North Williams Street Storm Improvements
Infrastructure
Results
Lebanon, OR 97355

Manzanita Transfer Station East Wall Improvements Project
Infrastructure
Bidding
$174,000 to $222,000 est. value
Manzanita, OR 97130

Neal Creek Phase 2 Habitat Enhancement Project
Infrastructure
Post-Bid
$250,000 to $500,000 est. value
Warm Springs, OR

Last Updated 05/30/2022 03:01 AM
Project Title

Westholm Park Playground Drainage

Physical Address View project details and contacts
City, State (County) Grants Pass, OR 97526   (Josephine County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $50,000 to $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all labor, materials, equipment and services required for the construction of the Westholm Park Playground Drainage. Work Includes Approximately The Following: Installing Approximately 708 Lf of Storm Drain Pipe, Installing 13 Cleanouts, 40 Sf Of Concrete Sidewalks, And Installing a Catch Basin.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents