Similar Projects
Fountain City Service Base Sustainment & Modernization
Design
Fountain City, WI

Port Washington Harbor Breakwater Repairs
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Port Washington, WI

Zoo Path Emergency/Temporary Repair
Infrastructure
Bidding
$30,000 to $60,000 est. value
Racine, WI 53402

Excavation and Rebuilding of a Drainage Pond on the Districts Property
Infrastructure
Bidding
West Bend, WI

Prospect Road Culvert
Post-Bid
Beaver Dam, WI 53916

Culverts
Term Contract
Post-Bid
WI

Operations Truck Ramp, Scale and Drainage Improvements
Results
Beloit, WI

South Fork Pheasant Branch Creek Repairs to Channel
Results
Madison, WI 53562

Lock Road - CTH U Storm Sewer, Golf Coarse Drive Storm Sewer and WPS Pond
Infrastructure
Bidding
Wrightstown, WI 54180

Concrete Culverts
Post-Bid
WI

2020 La Crosse River Bank Stabilization
Results
Less than $50,000 est. value
La Crosse, WI 54601

Erosion Control Devices
Term Contract
Post-Bid
WI

Steam Pits 14 Replacement - MEP
Results
Less than $320,000 est. value
Stevens Point, WI 54481

2021 Gramling Lane Culvert Replacement
Post-Bid
Less than $300,000 est. value
Dousman, WI 53118

Steam Pits 14 Replacement - General
Results
Less than $320,000 est. value
Stevens Point, WI 54481

Last Updated 11/13/2021 12:20 AM
Project Title

Connorsville - Bloomer, Culvert C-17-0047

Physical Address View project details and contacts
City, State (County) WI   (Dunn County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

STH 64; 0.085 Miles; Excavation Common, Borrow, Base Aggregate Dense, Backfill Structure, Concrete Masonry Culverts, HS Bar Steel Reinforcement, HS Bar Steel Reinforcement Coated, Pavement Marking, Construction Staking, Asphaltic Surface, Concrete Barrier Temporary Precast, Crash Cushions Temporary, Traffic Control, and Temporary Shoring Excavation Common, 495 CY; Borrow, 612 CY; Backfill Structure, 1,286 Ton; Base Aggregate Dense, 620 Ton; Breaker Run, 83 Ton; Concrete Masonry Culverts, 114 CY; Bar Steel Reinforcement, 22,260 Lbs; Bar Steel Reinforcement Coated, 1,570 Lbs; Marking Tape, 1,602 LF; Marking Epoxy, 1,477 LF; Construction Staking, 514 LF; Construction Staking, 2 LS; Asphaltic Surface, 106 Ton; Tack Coat, 21 Gals; Concrete Barrier Temporary Precast Delivered, 260 LF; Crash Cushions Temporary, 3 Each; Temporary Traffic Signals for Bridges, 1 LS; Temporary Stream Diversion Culvert, 1 Each; Temporary Shoring, 1,100 SF; Riprap Heavy, 48 CY.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents