Similar Projects
Last Updated | 08/22/2022 10:32 PM |
Project Title | L-4 Weir Replacement |
Physical Address | View project details and contacts |
City, State (County) | Palm Coast, FL 32137 (Flagler County) |
Category(s) | Heavy and Highway, Outdoor Lighting |
Sub-Category(s) | Dock/Pier/Marine, Roadway Lighting, Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $2,080,140 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The City of Palm Coast is requesting proposals from qualified contractors. This project shall consist of the removal of an existing concrete weir structure (L-4) and construction of a new control structure in approximately the same location along the Royal Palms Waterway in accordance with the attached set of construction plans. The weir to be removed/replaced is located East of Belle Terre Pkwy at approximate intersection of Royal Palms Pkwy and Town Center Pkwy. The Contractor shall provide all work required for a completed project including, but not limited to, labor, supervision, traffic control, materials, equipment, installation, and incidentals required for complete rehabilitation. CONTRACTOR shall also provide material samples, as necessary, to ensure compliance with manufacturers recommendations. Installation of all materials shall be in accordance with all applicable CITY standards and requirements, applicable Florida Departments of Transportation (FDOT) Standard Specifications for Road and Bridge Construction (latest edition), manufacturer and industry preferred standards. Work assigned under this contract may include but is not limited to the following: BID SECURITY/BID BOND: A Bid Bond shall accompany each Bid if the Bid amount is one-hundred thousand dollars ($100,000) or greater. The Bid Bond shall be for an amount not less than five percent (5%) of the Bid price and shall be made payable to the City as a guarantee that the Bidder will not withdraw his/her Bid for a period of one hundred twenty (120) days after the Bid closing time. PERFORMANCE, PAYMENT, MATERIAL AND WORKMANSHIP BONDS: In the event the Contract is awarded to the Successful Bidder and will enter into a written Agreement with the City and furnish a Payment Bond and Performance Bond in an amount equal to the Contract Price. The Material and Workmanship Bond shall be in an amount equal to ten percent (10%) of the Contract Price as adjusted on the Final Application for Payment. The Bidder will forfeit their Bid Security if they fail to do so. All Bonds shall be secured from or countersigned by an agency or surety company recognized in good standing and authorized to do business in the State of Florida QUESTION DEADLINE: July 14, 2022 at 2:00 PM AWARD OF CONTRACT: Allsubmittals will be evaluated by City staff in accordance with the criteria set forth in the bid documents. The City reserves the right to reject all bids/submittals, and to solicit and re-advertise for new bids, or to abandon the project in its entirety at any time during the process including, but not limited to, after the Notice of Intent to Award. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |