Similar Projects
Moorpark Ramp Improvements Project
Infrastructure
Bidding
$533,000 est. value
San Jose, CA 95117

McKee Road - Vision Zero Safety Improvement Project
Infrastructure
Bidding
$6,008,891 est. value
San Jose, CA 95127

De Anza Park Pathway Renovation
Infrastructure
Post-Bid
$546,000 est. value
Sunnyvale, CA 94087

Reconstruction of Curbs Gutters and Sidewalks
Infrastructure
Post-Bid
$1,150,000 est. value
Cupertino, CA

Removal and Replacement of Concrete within the Public Right-Of-Way
Infrastructure
Results
San Jose, CA

The Richey Center Sidewalk Repairs
Infrastructure
Results
San Jose, CA 95110

FHL Sidewalk Repairs, Jolon, CA
Infrastructure
Bidding
$500,000 to $1,000,000 est. value
Palo Alto, CA 94306

2022 Parking Lot Seal Coat
Infrastructure
Post-Bid
$68,000 est. value
Morgan Hill, CA 95037

Pedestrian Improvements on Various Locations 2021
Infrastructure
Results
$635,307 est. value
Sunnyvale, CA

Addison Avenue Safe Route to School and Green Street Improvements
Alteration
Post-Bid
Palo Alto, CA

Transit Boarding Islands
Infrastructure
Results
$1,210,000 est. value
San Jose, CA 95154

Curb, Gutter, and Sidewalk Maintenance
Alteration
Post-Bid
Los Gatos, CA

Public Right of Way ADA Improvements - Package One
Infrastructure
Results
Santa Clara, CA

Java Drive Road Diet and Bike Lanes
Infrastructure
Post-Bid
$423,000 est. value
Sunnyvale, CA

Sidewalk Repair Project
Infrastructure
Results
$79,000 est. value
Morgan Hill, CA

Last Updated 06/13/2022 01:03 AM
Project Title

Pedestrian and Bicycle Safety Improvements at the Intersection of Fremont Avenue and Manet Drive/Bobwhite Avenue

Physical Address View project details and contacts
City, State (County) Sunnyvale, CA 94087   (Santa Clara County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $398,808
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all labor, materials, and equipment and performing all work necessary and incidental to the completion of the project known as " Pedestrian and Bicycle Safety Improvements at the Intersection of Fremont Avenue and Manet Drive/Bobwhite Avenue, TR-20-01" consisting of the construction of concrete sidewalk bulbouts, traffic signal modifications, signing and striping, according to the plans and specifications as prepared by the City of Sunnyvale and according to the contract documents. Project is to be completed within a total maximum of sixty (60) working days.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents