Project Title | 2022 Fire Hydrant Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | Raymore, MO (Cass County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Replace 16 fire hydrants. All hydrants are to be Clow Medallion All hydrants/valves to be presumed unrestrained. Water to be shut off during replacement. Contractor to notify residents 48 hours in advance via door hangers of water service interruption. Install 7, six inch gate valves at 7 of the hydrants to be replaced. Install 3 new hydrants (2 of which are supplied by the City), each with a six inch gate valve. All hydrants are to be Clow Medallion. Install two, 8 inch gate valves on existing DIP lines. Replace 150 sq feet of sidewalk, if damaged Restore any damaged lawns or landscaping. Sod is to be used in maintained lawns, seed and Futerra F4 Netless blankets or approved equal in un-maintained areas. Straw is not allowed. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |