Last Updated | 08/18/2023 09:48 AM |
Project Title | Traffic Signal Replacement Project - Schedule A |
Physical Address | View project details and contacts |
City, State (County) | Grand Junction, CO 81507 (Mesa County) |
Category(s) | Heavy and Highway, Outdoor Lighting |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $5,000,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Counties: Mesa Region: 3 Contract UDBE Goal: 12.00 % Work Days: 115 This traffic signal replacement project consists of replacing traffic signal poles, mast arms, signal heads, detection equipment, conduit, signs, pedestrian curb ramps, and signal controller cabinets. The project is located in Grand Junction, CO on US6B (North Ave). There are multiple bid schedules with Schedule A including construction at the intersections with 5th St, 23rd St, and 28 Rd. Schedule B includes construction at the intersections with 5th St and 28 Rd. Schedule C includes construction at the intersection with 28 Rd. It is estimated that the total cost of all items in the bid will be: ( ) Between $0 and $1,000,000 (X) Between $1,000,000 and $5,000,000 ( ) Between $5,000,000 and $20,000,000 ( ) Greater than $20,000,000 CODOT - 001 - Traffic Signal Replacement Project - Schedule A *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |