Project Title

Kelsey Round Lake Park Boardwalk Replacement

Physical Address View project details and contacts
City, State (County) Andover, MN 55304   (Anoka County)
Category(s) Single Trades
Sub-Category(s) Carpentry
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes removal of existing 8' wide wooden boardwalk, posts and plate footings. Construct concrete abutments and construct new 8' wide wood boardwalk (approximately 380' long +/-). New boardwalk will be installed on helical piles (42 total piles), with estimated depth of 32' based upon geotechnical exploration requirements. Existing and proposed boardwalk is 2'-3' above existing grade. Contractor should visit site prior to bidding to view project location and access. Remove Existing Boardwalk & Appurtenances LS 1 Construct 8' Boardwalk & Appurtenances LS 1 Helical Pile Depth - Additional LF TBD Helical Pile Depth - Reduction LF TBD A. Remove and dispose existing wood boardwalk, frame existing footings. Existing boardwalk sits on metal footings that are generally between at grade to a couple feet into the ground with plate footings. B. Construction of 8' boardwalk, helical piles for support and concrete abutments. The boardwalk is approximately 380 linear feet (not including abutments). C. Perform surface restoration work, cleanup work, and any work incidental to the above. The contractor shall make every effort to minimize disturbance of the site, particularly in the wetland area. All disturbed areas shall be restored to existing or better condition. D. Perform all other miscellaneous work shown on the plans and included in the specifications. work will commence work on June 26, 2023; completion- May 24, 2024. Question Deadline 05/20/2023 Questions received less than four days prior to the date for opening of Bids will not be answered. Information / Clarification shall be submitted in writing by Email.

Details

Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents