Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

RFQ - Various Phase III Construction Engineering Projects, Various Routes, Various Counties
Term Contract
Bidding
Schaumburg, IL 60194

RFQ - Various Phase III Construction Engineering Projects, Various Routes, Various Counties
Term Contract
Bidding
Schaumburg, IL 60194

Engineering, Planning and Development
Post-Bid

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Post-Bid
Less than $45,000,000 est. value
Washington, DC

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

Infrastructure Investment and Jobs Act - Environmental AE MATOC
Renovation, Term Contract
Design
Less than $45,000,000 est. value

IDIQ Contract for Architect-Engineer Services for Compliance with Air Emission Regulations, EPCRA Regulations, Greenhouse Gas & All Other Environmental Media Regulations
Post-Bid

National Architecture/Engineering/Interiors (IDIQ) Contract
Results
Less than $25,000,000 est. value

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Design
$4,000,000 CJ est. value
Dixon, IL 61021

Architect and Engineering Services for Production Technical Services (PTS) for FEMA's Risk MAP Program
Post-Bid
$10,000 to $300,000,000 est. value

C--Multiple Award Task Order Contract (MATOC) for Geotechnical Engineering Service
Results
$500 to $25,000,000 est. value

Last Updated 08/12/2022 12:35 PM
Project Title

RFQ - I-80 Corridor Management from East of Ridge Rd to US 30, Phase III Construction Engineering Projects,

Physical Address View project details and contacts
City, State (County) Princeton, IL 61356   (Bureau County)
Category(s) Heavy and Highway, Professional Services
Sub-Category(s) Engineering, Maintenance
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Job No. C-91-206-22, I-80 Corridor Management from East of Ridge Rd to US 30, Phase III Construction Engineering Projects, Various Counties, Region One/District On This project may contain Federal Funds. This project requires 25% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on August 4, 2022, at 10:00 AM at the Region One/District One Office in Schaumburg. Construction Corridor Management services as required for all contracts associated with the reconstruction of the I-80 corridor from East of Ridge Road to US 30. Work includes, but is not limited to, providing services as directed by IDOT and in coordination with the services being provided under the Design Corridor Management Contract. The department is finalizing design and construction project limits and may modify those limits and scope during and after the time of negotiations. In general, the project limits are assumed to include the full I-80 corridor and all project located within the corridor. The anticipated construction completion date is November 30, 2028. The Consultant must complete and submit final measurements, calculations, and final contract records documents to the department no later than six (6) weeks after the completion of the project. The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). After all responses have been evaluated, firms may be asked to make oral presentations during the week of July 18, 2022. The firm acting as the prime must be prequalified in all the prequalification categories requested in the project advertisement even if they plan to subcontract part of the project, except where noted in a specific project advertisement. Any work being done by a consultant, prime or sub must be prequalified in the IDOT prequalification category of work they are performing. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 016- RFQ - I-80 Corridor Management from East of Ridge Rd to US 30, Phase III Construction Engineering Projects,

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents