Similar Projects
Shadowood Lakes Townhomes
New Construction - 52,812 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Fort Wayne, IN

Norarrow Multifamily Housing
New Construction, Infrastructure - 270,880 SF
Conception
$80,000,000 CJ est. value
Fort Wayne, IN 46845

Tiburon/Livingston Lakes Extended
New Construction, Infrastructure
Design
Fort Wayne, IN 46818

Hunters Development
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fort Wayne, IN 46845

Columbia Street West Mixed-Use
New Construction, Renovation - 36,000 SF
Post-Bid
Fort Wayne, IN 46802

Hunt Club Apartments
New Construction - 29,076 SF
Post-Bid
Fort Wayne, IN 46804

Demolition and Lot Restoration for Neighborhood Code
Infrastructure
Results
Fort Wayne, IN

2021 HMA Resur­face Package 1
Infrastructure
Results
Fort Wayne, IN

Electric Works Mixed Use Phase II
New Construction
Construction
$107,000,000 est. value
Fort Wayne, IN

RFP Design Architectural and Engineering Services for the Expansion and Renovation of Levan R. Scott Academy
Addition, Renovation, Infrastructure
Pending Verification
$670,000 CJ est. value
Fort Wayne, IN 46806

Dupont Meadows Development
New Construction - 1,660 SF
Pending Verification
Fort Wayne, IN 46818

Shift or Reconfigure Existing Taxiway - Fort Wayne Allen County Airport Authority
Infrastructure
Conception
$895,148 est. value
Fort Wayne, IN 46825

Cedar Grove
New Construction
Design
$70,000,000 est. value
Fort Wayne, IN

Asphalt Cut Repair Services
Infrastructure
Post-Bid
Fort Wayne, IN

Community Cross­ings HMA Resurface 2021
Infrastructure
Results
Fort Wayne, IN

Last Updated 03/28/2023 10:05 AM
Project Title

Isabelle Gardens

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46805   (Allen County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 2023, construction is underway. *This project has been awarded and all trades have been let.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents