Similar Projects
Designer Greetings
Addition - 79,968 SF
Conception
Edison, NJ 08817

Champion Contracting Warehouse Addition
Addition
Conception
Farmingdale, NJ 07727

Midland Street Self-Storage
New Construction - 128,440 SF
Design
Rochelle Park, NJ 07662

Christian Brothers Academy Campus Improvements
Renovation, Addition - 17,211 SF
Design
$6,000,000 est. value
Lincroft, NJ 07738

Renovations to West Windsor-Plainsboro High School North
Renovation
Bidding
$2,000,000 est. value
NJ 08536

Warespace - 7000 Atrium
Renovation - 44,963 SF
Bidding
Mount Laurel Township, NJ 08054

Woodshop Renovation for Sussex County Technical School
Post-Bid
Sparta, NJ 07871

Design, Manufacture and Build of a New Prefabricated Garage for The Storage of Fire Apparatus
New Construction
Post-Bid
Morganville, NJ 07751

Classroom Alterations and Auditorium Upgrades at Multiple Schools
Renovation
Results
$4,729,000 est. value
Piscataway, NJ 08854

Guidance Suite Alterations at Voorhees Middle School
Renovation
Results
Voorhees, NJ 08043

Page Homes
New Construction, Demolition - 3,000 SF
Construction
$10,000,000 est. value
Trenton, NJ 08646

Extra Space Storage - Woodbridge
New Construction, Demolition - 140,798 SF
Construction
$4,755,000 est. value
Fords, NJ 07095

Dunaroamin Road Warehouse
New Construction - 44,770 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
NJ 07719

Heller Warehouse - Amazon
New Construction - 800,000 SF
Pending Verification
$3,762,000 est. value
Dayton, NJ 08810

Lot 1 Holdings Warehouse
New Construction - 10,068 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Sicklerville, NJ 08081

Last Updated 04/27/2022 06:27 AM
Project Title

New Storage Building at Hunterdon Central Regional High School

Physical Address View project details and contacts
City, State (County) Flemington, NJ 08822   (Hunterdon County)
Category(s) Commercial, Education
Sub-Category(s) Middle/Senior High School, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of the erection of an approximately 5,000 sf prefabricated metal framed building in the existing courtyard with work including, but not limited to, demolition of existing classroom trailers, site work, concrete foundations, footings and slabs, interior finish construction and mechanical, electrical, and plumbing work.

Details

Middle/Senior High School, New Construction, Warehouse/Storage, 5,000 SF New Construction.
Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents