Similar Projects
Walk-In Cooler/Freezer at Whiteaker Head Start Facility (Equipment Only)
Term Contract
Design
Eugene, OR 97402

Farebox Replacement Project
Renovation
Sub-Bidding
$200,000 CJ est. value
Portland, OR 97204

Willow Lake Boiler Replacement
Renovation
Sub-Bidding
$450,000 CJ est. value
Salem, OR 97301

Video Surveillance System Installation
Alteration
Post-Bid
Portland, OR 97232

Kohler Generator 20K Unit to Include Installation for Western Oregon Service Unit
Term Contract, Alteration
Post-Bid
Salem, OR 97305

Mulching Head Attachment for Excavator
Alteration
Results

Mulching Head Attachment for Excavator
Alteration
Results

Concert Sound, Stage and Lighting
Alteration
Post-Bid
Central Point, OR

Miscellaneous Brass Fittings
Alteration
Results
Salem, OR

Turn-Key 19.5, 22K & 33K GVW Bucket Trucks PA
Term Contract
Post-Bid

Loading Dock and Electrical Dock Repair at Oregon Convention Center
Renovation, Alteration - 8,000 SF
Results
$300,000 est. value
Portland, OR 97239

Advantor External Cameras & Installation
Term Contract
Post-Bid
Klamath Falls, OR 97603

Purchase of Polymer Flocculent
Alteration
Results
Hillsboro, OR

Purchase of 100 KVA and 75 KVA Pad Mount Transformers
Term Contract
Post-Bid
Newport, OR 97365

PDX Maintenance Facility CNG Fuel Station Compressor Replacement
Alteration
Results
$725,000 est. value
Portland, OR 97239

Last Updated 07/13/2023 11:20 AM
Project Title

Water Treatment Plant Valve Replacement Project

Physical Address View project details and contacts
City, State (County) Silverton, OR 97381   (Marion County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes removal of pneumatic valve actuators, and replacement with electric valve actuators Bid security shall be submitted with the Bid Proposal and failure to submit shall be cause for rejection of the bid. The bidder, at his or her option, shall furnish a bid bond, cashier's check or a certified check made to the City of Silverton for an amount equal to no less than ten (10) percent of the total amount of the bid. This proposal is accompanied by a certified check, cashier's check or bid bond in the amount of 10% of the total bid. The Bidder shall furnish performance and payment bonds, each in an amount at least equal to 100 percent (100%) of the contract price as security for the faithful performance and payment of all Bidder obligations. These bonds shall remain In effect at least one year after the date when final payment is due. The project must be completed no later than June 15, 2024, unless otherwise agreed upon, in writing, by the City and the Successful Bidder. The City reserves the right to modify this schedule at the City's discretion. Proper notification of changes will be made to all interested parties via the City's website silverton.or.us. The city currently has an estimated budget of half a million but no formal engineer's estimate. All questions related to the project must be directed to the Project Manager no later than July 3, 2023 at 2:00 p.m. Questions must be submitted via e-mail to bjensen@silverton.or.us.

Details

Division 11 - Equipment, Operation and Maintenance of Equipment, Vehicle Service Equipment, Maintenance Equipment, Unit Kitchens, Residential Equipment, Residential Appliances, Agricultural Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents