Similar Projects
Goraleigh Chiller
Bidding
Raleigh, NC

Security, Lighting, and HVAC Controls
Post-Bid
Raleigh, NC

Cooling Tower Replacement
Post-Bid
Raleigh, NC 27610

Chiller and Air Handler
Results
Less than $33,739 est. value
Raleigh, NC

Bard Wall Mount Heat Pump - 3.5 Ton
Results
Less than $55,860 est. value
NC

Air Conditioning Equipment
Post-Bid
Raleigh, NC 27603

Bard Wall Mount Heat Pump - 3 Ton
Results
Less than $33,190 est. value
Raleigh, NC

Heating and Air Equipment
Post-Bid
Raleigh, NC 27603

Chiller Replacement - Lee Hall
Results
Less than $600,000 est. value
Raleigh, NC

Pullen Aquatic Center HVAC Improvements
Post-Bid
Raleigh, NC 27606

Replace Chilled Water Coils
Results
Less than $130,347 est. value
Raleigh, NC 27601

DPS - Morrison Aggrey Dorm Heating System Replacement
Post-Bid
Raleigh, NC 27699

HVAC Equipment at North Carolina State Lab of Public Health
Term Contract
Results
Less than $15,986 est. value
Raleigh, NC 27607

Weatherization Services HVAC, Plumbing, Electrical, Insulation and Air Sealing Contractors
Renovation
Post-Bid

Fuquay Varina Middle School Chiller Replacement
Results
Fuquay-Varina, NC 27526

Reported 05/13/2020 12:00 AM
Project Title

Century Station Air Cooled Chiller Replacement

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27601   (Wake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Description of Work: Contractor shall provide all materials, labor, tools, equipment and supervision to accomplish tasks as outlined. 8.1 Contractor to perform all work to local, state, national, and manufacturers standards and recommendations 8.2 Contractor to perform work to P-100 Standards 8.3 Contractor to remove all field connections to the old chiller including but not limited to electrical, control wiring, and piping, etc. 8.4 Contractor to provide a submittal indicating what new chiller will be installed that will meet current space capacity needs, and P-100 standards 8.5 Contractor to provide a new air cooled chiller 8.6 Contractor to install new air cooled chiller to manufacturer, local, state, national, and P-100 guidelines 8.7 Where there is a conflict of codes the more stringent shall apply 8.8 Contractor to make any and all field connections 8.9 Contractor to install an isolation valve in the CHW Supply line and CHW Return line 8.10 Contractor to Re-Insulate water lines 8.11 Contractor to perform start up with a log of all pertinent data from start up to be kept in the Maintenance office 8.12 Contractor to ensure proper operation of complete system 8.13 Contractor to perform terminal clean up

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents