Similar Projects
Maintenance and Repair Services for Fume Hoods/Controllers
Post-Bid
Annandale, VA 22003

Woodrow Wilson High School - Cooling Tower and Electrical Switchgear Replacement
Post-Bid
Portsmouth, VA

Roof Top Air Handling Unit
Results
Chesapeake, VA 23323

Z--TIERED EVALUTIONS Renovate for Water Quality
Results
$2,000,000 to $5,000,000 est. value
Salem, VA 241536404

HVAC Preventative Maintenance and On Call / Multiple Locations
Term Contract
Post-Bid
Appomattox, Chesterfield, Glen Allen, Salem, Wytheville, VA 23235

Trani Roof Repair and HVAC Replacement
Results
Richmond, VA 23220

Preventative Maintenance and Repair Services for Compressed Breathing Air Systems
Term Contract
Post-Bid
VA

Renewal of Maintenance Services for Biosafety Hoods, Chemical Fume Hoods, and Barrier Isolators
Results
Portsmouth, VA 23708

Water Coolers and Dispensers - Southwest Virginia Community College
Post-Bid
Cedar Bluff, VA 24609

ACDF Air Handler Unit Replacement
Results
Arlington, VA 22201

Heating, Ventilation and Air Conditioning Services for DGS
Post-Bid
Richmond, VA

Chiller Maintenance Services
Results
Dahlgren, VA 22448

HVAC Preventative Maintenance
Term Contract
Post-Bid
Front Royal, VA 22630

CSS 17592 - Replace 250 Gallon Air Compressor, Fort Eustis (VA056)
Results
Fort Eustis, VA

HVAC Preventive Maintenance
Post-Bid
Waynesboro, VA 22980

Reported 02/18/2022 12:00 AM
Project Title

PCPS HVAC Improvements and Window Replacement

Physical Address View project details and contacts
City, State (County) Dublin, Hiwassee, Pulaski, VA 24084   (Pulaski County)
Category(s) Single Trades
Sub-Category(s) HVAC, Windows/Doors
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect/Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

HVAC Equipment and Window Replacement for Pulaski County Public Schools as listed below: a. Dublin Elementary School HVAC and Window Replacement for the Pulaski County School Board. This project consists of air conditioning the existing gym, cafeteria, kitchen and guidance offices. The existing windows will also be replaced. b. Pulaski County High School HVAC Improvements for the Pulaski County School Board. This project consists of air conditioning the existing gym and the existing art rooms. c. Critzer Elementary School HVAC Improvements for the PulaskiCounty School Board. This project consists of replacing the rooftop unit at the cafeteria. d. Snowville Elementary School HVAC Improvements for the Pulaski County School Board. This project consists of replacing the rooftop unit at the cafeteria.

Details

Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete, Cast-in-Place Concrete, Miscellaneous Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Metal Fabrications.
Division 07 - Thermal and Moisture Protection, Joint Sealants.
Division 08 - Openings, Metal Doors and Frames, Aluminum Doors and Frames, Storefronts, Aluminum-Framed Storefronts, Fire-Rated Aluminum Storefronts, Metal Windows, Aluminum Windows, Glazing.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents