Similar Projects
CDBG Water System Improvements
Bidding
Adamsville, TN

Town Center Water Main
Renovation
Bidding
White House, TN 37188

Hydrant Assist/Relay Valve
Post-Bid
Chattanooga, TN 37402

Standard Valves
Term Contract
Post-Bid
Chattanooga, TN 37402

CKL Electrical and Water Line Rehabilitation
Results
$1,000,000 to $5,000,000 est. value
Chattanooga, TN 37415

TVA System Operations Center Off-Site Water Line Extension
Results
Chattanooga, TN 37402

Highway 70/56 Water Line Relocation
Bidding
$225,000 est. value
Cookeville, TN 38501

36” Dezurik Knife Gate Valves
Post-Bid
Chattanooga, TN 37400

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water Line Extension Improvements for 2020 CDBG Water System Improvements
Bidding
Maynardville, TN

CDBG 2019 Wastewater Collection Improvements
Post-Bid
Rockwood, TN

Purchase of AMR Style Water Meters
Results
Signal Mountain, TN 37377

Midfield Apron Expansion Water and Sewer Improvements
Bidding
$550,000 est. value
Gallatin, TN 37066

Moccasin Bend WWTP Equalization Basin And Blower Replacement Improvements
Post-Bid
Chattanooga, TN 37405

2020 Red Bank Sewer Rehabilitation
Results
Red Bank, TN

Last Updated 11/02/2020 08:35 AM
Project Title

Snow Hill Road Force Main Repair Phase 1

Physical Address View project details and contacts
City, State (County) Chattanooga, TN   (Hamilton County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $77,850
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For the construction of Snow Hill Road / Roy Lane Force Main Repairs: Phase 1 that consists of replacing approximately: 650 linear feet (LF) of 8-inch Ductile Iron Pipe (DIP) with 8-inch C900 DR-14 pipe at an approximate depth between 3 and 4 feet; repaving of approximately 300 linear feet (LF) class B concrete; connecting to the existing force main on both ends; and clearing the easement work area. The scope of the project will include all by pass pumping, pipe preparation, the furnishing of all labor, material, equipment, tools, supervision, incidental, and any other items necessary or convenient to satisfactorily complete the construction.

Details

Division 03 - Concrete.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents