Similar Projects
Waterview Drive Warehouse
New Construction - 80,000 SF
Conception
Shelton, CT

Pepper Street Warehouse
New Construction - 28,814 SF
Conception
Monroe, CT 06468

Nejame Plaza
New Construction - 7,000 SF
Design
$1,500,000 est. value
Danbury, CT 06810

Self Storage Facility
Renovation - 3,884 SF
Design
Bridgeport, CT

Storage Building Renovations (S)
Renovation
Bidding
$600,000 est. value
Stamford, CT 06902

Renovation of Second Floor
Renovation - 700 SF
Bidding
$340,000 est. value
Bridgeport, CT 06605

Pre Fab Metal Building at Stamford High School
New Construction - 2,460 SF
Post-Bid
$2,000,000 est. value
Stamford, CT 06906

Shehan Community Center Construction Services
Renovation
Post-Bid
$4,000,000 est. value
Bridgeport, CT 06604

Cold Storage Barn Repairs
Results
Ridgefield, CT 06877

Summer Street Warehouse
Addition - 4,605 SF
Construction
$1,000,000 est. value
Stamford, CT 06905

Lasership
Renovation - 40,000 SF
Construction
$400,000 est. value
Stamford, CT 06902

Safe & Sound Storage
New Construction
Pending Verification
Danbury, CT

Lordship Boulevard Warehouse
New Construction - 169,622 SF
Conception
Stratford, CT 06615

A Little More Space Self Storage Facility
New Construction, Renovation - 14,300 SF
Design
Monroe, CT

Safeguard Self-Storage / Bridgeport
Renovation - 42,000 SF
Conception
$1,000,000 est. value
Bridgeport, CT 06604

Reported 06/22/2022 09:21 AM
Project Title

Stamford Metal Group / Bridgeport

Physical Address View project details and contacts
City, State (County) Bridgeport, CT 06605   (Fairfield County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 1 story addition to commercial building. As of June 21, 2022, this project is pending special permit, a site plan review and a coastal site plan review approval. Information regarding the selection of an architect and general contractor has not been released. While a firm construction timeline has not yet been established, construction is expected to begin in the third quarter 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Warehouse/Storage, Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents