Similar Projects
Douglas Byrd Middle School HVAC Upgrade
Alteration
Bidding
Fayetteville, NC 28304

Steam Cleaning of HVAC Air Handling Equipment
Alteration
Bidding
Goldsboro, NC 27534

Installation of 60-ton AAON HVAC Unit
Post-Bid
Beaufort, NC 28516

HVAC Repairs and Maintenance
Term Contract
Post-Bid
Durham, NC 27701

Legacy and Jones Residence Halls Make-up Air
Results
Less than $1,655,170 est. value
Greenville, NC

EMD Facility HVAC Upgrades
Results
Wilmington, NC

McEniry HVAC and IT Infrastructure Upgrades
Construction
$10,000,000 est. value
Charlotte, NC 28223

Unc School Of The Arts Residence Hall HVAC Phase 2
Construction
Winston-Salem, NC

Chiller Replacements - Antioch Elementary SchoolKensington Elementary School
Alteration
Bidding
Matthews, Waxhaw, NC 28104

HVAC Services
Term Contract
Post-Bid
Less than $150,000 est. value
Greenville, NC 27835

Cooler and Freezer Restoration at Durham County Detention Center
Term Contract
Results
Durham, NC 27701

Replacement of Boiler and Air Handler Units for the Hanes Veterinary Medical Center at the NC Zoo
Alteration
Bidding
Asheboro, NC 27205

Parkwood Elementary School Chiller Replacement
Post-Bid
Durham, NC 27713

Chiller Installation and Repair
Term Contract
Results
Raleigh, NC 27610

HVAC and Electric Renovation of the Courthouse
Post-Bid
$400,000 to $600,000 est. value
Trenton, NC 28585

Last Updated 12/07/2021 04:25 PM
Project Title

Replacement of HVAC Unit for USCG Base Elizabeth City Bldg 49

Physical Address View project details and contacts
City, State (County) Elizabeth City, NC   (Pasquotank County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall provide all supervision, labor, equipment, parts and materials to install one (1) roof mounted 5 ton (FIVE) “GAS PACK” (Packaged air cooled electric air conditioning unit with gas heat) including roof curb, insulated metal supply and return duct necessary to connect the new unit to the existing ductwork, natural gas piping, electrical power and control wiring. This work is located at the USCG Base Elizabeth City, NC in building 49

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents