Similar Projects
Ladue Middle School
Renovation
Post-Bid
Saint Louis, MO 63124

Ritenour High School Toilet Room 211
Renovation
Post-Bid
Saint Louis, MO 63114

Disaster Recovery Services
Results

Kirkwood High School (KHS) Security Office Renovations Project 2021
Renovation
Results
Kirkwood, MO 63122

South County Technical High Schools Additions and Alterations
Renovation
Post-Bid
$6,000,000 to $8,000,000 est. value
Saint Louis, MO 63127

Normandy High School Secured Connector
Addition - 25,878 SF
Results
Normandy, MO 63121

Press Box Renovation
Renovation
Post-Bid
Saint Louis, MO

Summer 2021 Building Renovations and Site Improvements
Renovation
Results
MO

Affton High School Field
Renovation
Post-Bid
Saint Louis, MO 63123

West High Electrical Substation Pre-Purchase
New Construction
Results
Ballwin, MO 63011

Affton High School Dugout Renovation
Renovation
Post-Bid
Saint Louis, MO 63123

Summer 2021 Building Improvements
Renovation
Post-Bid
Chesterfield, Creve Coeur, Manchester, Saint Louis, MO 63141

Parkway South High Balcony Waterproofing Replacement
Renovation, Alteration
Post-Bid
Manchester, MO 63021

Summer 2022 Building Bid Package A
Renovation
Post-Bid
Chesterfield, MO

Kirkwood SD - Hough Tech Center and Turner Building Renovations
Renovation
Post-Bid
Kirkwood, MO 63122

Last Updated 01/05/2022 08:23 AM
Project Title

High School Library

Physical Address View project details and contacts
City, State (County) Clayton, MO 63105   (Saint Louis County)
Category(s) Education
Sub-Category(s) Library - School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Schematic Drawings, Bidding Expected February 2022
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Middle/Senior High School, Renovation, Library - School, 10,000 SF Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents