Similar Projects
Combined Sewer Overflow 402-406 Wet Weather Improvements - City Of Cincinnati
Renovation
Conception
$14,018,000 est. value
Cincinnati, OH 45202

Bolton Plant Well #4 Replacement - City of Cincinnati
Infrastructure
Conception
$1,500,000 CJ est. value
Cincinnati, OH 45207

Miscellaneous Repairs to Wastewater Pumping and Lift Stations
Renovation
Bidding
$300,000 CJ est. value
Cincinnati, OH 45202

Muddy Creek WWTP Thickening Replacement and Pumping Improvements
Renovation
Post-Bid
Cincinnati, OH 45233

Muddy Creek WWTP (Wastewater Treatment Plant) Thickening Replacement and Pumping Improvements
Renovation
Post-Bid
$6,376,900 est. value
Cincinnati, OH

Little Red Schoolhouse STS Replacement
Renovation
Results
Cincinnati, OH 45243

SCWWTP Thickening and Settlement Improvements
Renovation
Results
$4,252,355 CJ est. value
Cincinnati, OH 45242

Daly Road Treatment Facility Modifications - City of Cincinnati
Renovation
Conception
$443,100 CJ est. value
Cincinnati, OH 45224

Muddy Creek Wastewater Treatment Plant EHRT and Pump Station
Renovation
Post-Bid
$106,000,000 CJ est. value
Cincinnati, OH 45233

Mill Creek Wastewater Treatment Plant Dewatering Building Odor Control - City of Cincinnati
New Construction, Infrastructure
Conception
$7,965,000 CJ est. value
Cincinnati, OH 45204

Mill Creek Treatment Plant Fuel Oil Storage Tank Repairs
Infrastructure
Post-Bid
$300,000 CJ est. value
Cincinnati, OH 45204

MCWWTP Disinfection and Outfall - City of Cincinnati
Renovation
Conception
$1,113,900 CJ est. value
Cincinnati, OH 45202

Mill Creek WWTP Plant Influent and Headworks Odor Control
Renovation
Post-Bid
$1,832,000 CJ est. value
Cincinnati, OH 45202

MCWWTP High Rate Treatment Pump Station - City of Cincinnati
Renovation
Conception
$14,000,000 CJ est. value
Cincinnati, OH 45202

Richard Miller Treatment Plant (RMTP) Power Study
Renovation
Post-Bid
$200,000 CJ est. value
Cincinnati, OH 45202

Last Updated 04/06/2023 02:13 PM
Project Title

Richard Miller Treatment Plant Clearwell #3

Physical Address View project details and contacts
City, State (County) Cincinnati, OH 45230   (Hamilton County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $42,831,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

MBE/WBE - 8% / 5% Addendum #1-#3 have been issued as of 2-6-2023. The contractor shall start work within Thirty (30) calendar days from receipt of written notice to begin work, from the City Agency for whom the work is to be performed. No work of any kind shall be done by contractor until so notified. The contractor shall secure delivery of all equipment and materials required and shall complete on-site work within Seven Hundred and Thirty (730) calendar days from receipt of notice to begin work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents