Similar Projects
Bishop Storage
New Construction - 360,000 SF
Design
$10,000,000 CJ est. value
American Fork, UT 84003

Alpine Equipment Repair
Renovation - 4,568 SF
Design
American Fork, UT 84003

384 Center Building Remodel
Renovation - 6,747 SF
Bidding
Provo, UT 84601

New Salt Shed and Storage Area
New Construction - 7,000 SF
Post-Bid
Elk Ridge, UT 84651

Police East Bay Metal Building
Post-Bid
Provo, UT 84606

Holbrook Industrial Buildings 1, 2, 3
New Construction - 502,028 SF
Construction
$10,000,000 CJ est. value
Lehi, UT 84045

Colmena Warehouse D
Renovation
Construction
Spanish Fork, UT 84660

Lakeview Park
New Construction - 508,311 SF
Pending Verification
$10,000,000 CJ est. value
Orem, UT 84058

Mountain Tech 6 and 7
New Construction - 420,446 SF
Pending Verification
$10,000,000 CJ est. value
Lindon, UT 84042

Cold Springs Storage
New Construction
Design
Lehi, UT 84043

Pando Lake
New Construction - 97,665 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
American Fork, UT 84003

Warehouse
New Construction
Construction
Provo, UT 84601

Ford-Harward Industrial Subdivision
New Construction
Pending Verification
Spanish Fork, UT 84660

Roderick Catalyst Building 3
New Construction - 154,347 SF
Design
$10,000,000 CJ est. value
American Fork, UT

General Contractor Prequalification - Heritage Park Booster Pump Station
New Construction
Post-Bid
Orem, UT

Last Updated 02/04/2022 03:09 AM
Project Title

Pre Qualified General-Springville Hatchery Maintenance and Storage

Physical Address View project details and contacts
City, State (County) Springville, UT 84663   (Utah County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the demolition of (2) existing buildings and site preparation for a new 60\' x 100\' pre-engineered metal building (pemb) to house a 4-bay maintenance shop, tool storage, office/kitchenette, restrooms, and storage. Site work includes a new gravel access drive with concrete aprons at each side of the building, as well as a concrete foundation/retaining wall that transitions to a stack boulder wall. Utility connections to the new pemb include those for an automatic fire sprinkler system, as well as a new gas connection to an adjacent existing building. All utilities connect to existing utilities on site except for a new sewer line to be run to N Main St.

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents