Similar Projects
New Police Station
New Construction
Conception
Wendell, NC 27591

New Fire Station
New Construction
Conception
Newland, NC

River Lights Fire Station
New Construction, Infrastructure - 13,873 SF
Design
$5,700,000 CJ est. value
Wilmington, NC 28412

Design and Construction of Fire Station No. 51
New Construction - 8,000 SF
Design
Leland, NC 28451

Sanford Fire Station No. 5
New Construction, Infrastructure - 12,374 SF
Bidding
$6,400,000 CJ est. value
Sanford, NC 27330

Riverlights Fire Station No.6
New Construction, Infrastructure
Bidding
$6,000,000 CJ est. value
Wilmington, NC 28412

New Fire Station 3 - City of Raleigh
New Construction, Infrastructure - 11,749 SF
Post-Bid
$11,500,000 CJ est. value
Raleigh, NC 27610

Emergency Management Office
Renovation
Post-Bid
Concord, NC 28025

Jackson Street EMS
Results
$1,500,000 est. value
Murphy, NC 28906

Professional Architectural Services for Fire Station 4 Relocation
New Construction - 19,000 SF
Results
Fayetteville, NC 28302

Fire Station 22
New Construction - 16,500 SF
Construction
Raleigh, NC

Mooresville Fire Station 6
New Construction - 15,000 SF
Construction
Less than $4,570,559 est. value
Mooresville, NC 28115

Apex Main EMS Station
New Construction, Infrastructure - 4,340 SF
Pending Verification
$2,000,000 CJ est. value
Apex, NC 27502

Samarcand Training Academy Improvements
Renovation
Conception
$2,300,000 est. value
Jackson Springs, NC

New North Fire Station
Design
Laurinburg, NC 28352

Last Updated 02/02/2023 11:31 AM
Project Title

9-1-1 Emergency Communications Center Renovation

Physical Address View project details and contacts
City, State (County) Morehead City, NC 28557   (Carteret County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $30,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Carteret County Government is seeking bids to renovate the 9-1-1 Emergency Communications Center within the Morehead City Police Department complex located at 300 N 12th St, Morehead City, NC 28557. A Performance Bond is not required. A Payment Bond is not required. All inquiries concerning the Scope of Services, Proposal Submission Requirements or Site Visits should be directed to: Mr. Ray Farnum Project Coordinator 5231 Business Drive, Newport, NC 28570 Email: Ray.farnum@carteretcountync.gov Telephone: 252-241-6913 Carteret County Government is seeking bids to renovate the 9-1-1 Emergency Communications Center within the Morehead City Police Department complex located at 300 N 12th St, Morehead City, NC 28557. Details are as follows: o The 9-1-1 Emergency Communications Center is looking to upgrade their current emergency consoles. Electrical and flooring work will be required to facilitate installation of the new consoles. o This project shall be fulfilled in phases, while area is unoccupied, which will be determined after proper electrical identification. The flooring and electrical work shall be coordinated with the POC which will be contingent on console supplier's timeline. o The Contractor shall identify and label which breaker provides power for each console and related receptacles prior to any other work commencing. All existing electrical and data are beneath the raised floor system. o The Contractor shall remove and dispose existing carpet tiles as well as remove the raised floor system which screws may be required for replacement in order to relocate and or add receptacles to accommodate the electrical specifications and location for nine (9) new consoles that will be supplied by the owner. o The Contractor shall ensure that each console consist of a minimum of two (2) dedicated 20-amp circuts with a minimum of six (6) receptacles meeting or exceeding specified requirements shown below. Some of the existing flooring panels have gromets for the electrical and data, these panels shall be relocated for the new locations to avoid extra holes and patch openings as required. o The Contractor shall furnish and install new 2'x2' static resistant commercial grade carpet tiles, per manufactures recommendations, that shall line up with the raised floor system, in other words the carpet seams shall match the raised flooring seams. The Contractor shall install all necessary thresholds, where required, and new 4" black vinyl cove base. Color of carpet tiles are preferred in gray or blue as approved by Owner. The Contractor is asked to provide submittals with bid. The Contractor shall supply a dumpster to dispose of material and existing surplus items that will be identified during the site visit These items consist of existing desk, chairs and miscellaneous furniture. The console supplier will dispose of the existing consoles in the same dumpster. Dumpster location TBD. o The Contractor shall verify all measurements to ensure proper electrical locations. o Moving of all materials, equipment and all cleaning are to be handled by the Contractor. o The anticipated start date for the console supplier is January 16, 2023. It is estimated to take six (6) hours to install a new console. The awarded Contractor shall start work before, during and after the console supplier's installation process. o The Contractor shall be responsible for requesting and paying for criminal background checks as well as obtaining finger prints on all individuals providing services under this contract. Background checks may be provided by any vendor, or from a North Carolina State agency, providing the criminal history check is done nationwide. A criminal history will not automatically disqualify an employee from employment on this contract unless explicitly mandated by law. Background checks and finger prints shall be provided to the County prior to any work commencing. o The Contractor shall obtain all permits, if required, give all notices to POC, and comply with all laws, ordinances, codes, rules and regulations bearing on the conduct of the work. No time extensions shall be granted or financial consideration given to the Contractor for time or monies lost due to violations of any such ordinance, code, law or regulations that may occur. Carteret County Government reserves the right to accept or reject, in whole or in part, proposals directed to the best interest of the County. Each contractor shall fill out the required information within this RFP including Attachment A, Federal Contracting Requirements, UG Provisions, 2 C.F.R. 200.326 and 2 C.F.R. Part 200, Appendix II, Required Contract Clauses as well as the IRAN DIVESTMENT ACT, submit Certificate of Insurance for liability and Worker's Compensation in order for the proposal to be qualified. The Contractor shall commence work to be under this Contract on a date to be specified in written order from the County and or shall fully complete all work hereunder by February 3, 2023 as will be stated in the Notice to Proceed for this contract.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents