Similar Projects
Last Updated | 04/20/2023 05:32 AM |
Project Title | 2023 Resurfacing of Various Township Roads in Ballville and Green Creek Townships |
Physical Address | View project details and contacts |
City, State (County) | Fremont, OH 43420 (Sandusky County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $357,685 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Proposals must be submitted on the forms furnished or downloaded from the above website and must contain the name of every person interested therein. The Proposal shall be accompanied by a Bid Guarantee and Contract Bond in the amount of 100% of the amount bid or a Certified or Cashier's Check or a Letter of Credit in an amount of at least 10% of the amount bid. The Boards reserve the right to reject any or all bids and to waive any formalities in any bid. Each bidder must submit evidence of its experience on projects of similar size and complexity. All contractors and subcontractors involved with the project will, to the extent practicable use Ohio products, materials, services, and labor in the implementation of their product. Additionally, contractor compliance with the equal employment opportunity requirements of Ohio Administrative Code Chapter 123, Governor's Executive order of 1972, and Governor's Executive Order 84-9 shall be required. ENGINEER'S ESTIMATE: $355,000.00 Scope- Pavement Planing, Asphalt Concrete, Asphalt Concrete Intermediate Course, Type 1, (449),Railroad Symbol Marking, 96 inch,Compacted Aggregate, Type 411, Asphalt Concrete Surface Course, Type 1, (449), PG64-22, avement Planing, Asphalt Concrete, The planing depth shall match the combined thicknesses of the proposed intermediate and surface courses of asphalt concrete. The finished cross-slope of the planed surface and the finished asphalt concrete surface shall be the same, typically 3/16" per foot. Paving is to be a continuous operation. Regulate the speed of the paver to eliminate stops between loads. COMPLETION DATE - September 30, 2023 |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |