Similar Projects
104th Avenue - South Platte River To Highway 85 Widening - City of Commerce City
Infrastructure
Conception
$6,916,000 CJ est. value
Commerce City, CO 80603

The Flaming Gorge Project
New Construction, Infrastructure
Design
$1,000,000,000 CJ est. value
Greeley, CO 80631

Flying Circle Retail Development
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Dacono, CO 80514

37th Street Widening Phase 1
Infrastructure
Bidding
$4,000,000 CJ est. value
Evans, CO 80620

2022 Storm Jetting
Infrastructure
Bidding
$400,000 CJ est. value
Evans, CO 80620

CDOT Maintenance Facility and Park-and Ride Design Build
Addition, Infrastructure
Post-Bid
Frederick, CO

Rail Road Park Pickleball Court
Renovation
Post-Bid
Fort Lupton, CO 80621

Neighbors Point Park Project
New Construction
Results
Firestone, CO

Greeley West Park Playground for Culture, Parks and Recreation Department
New Construction
Results
Greeley, CO 80634

Fossil Creek Ranch - Filing 1 & 2
Construction
Windsor, CO

Immaculata Plaza II (New Build) and I (Renovation)
New Construction, Renovation, Infrastructure
Construction
$1,000,000 CJ est. value
Greeley, CO 80631

Greeley Apartment / HP Site
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Greeley, CO 80634

New Construction, Additions, and Renovations - 2022 Bond - Weld RE-4 School District
New Construction, Renovation, Infrastructure
Pending Verification
$271,000,000 CJ est. value
Greeley, CO 80631

Cutting Edge Steel
Addition, Demolition, Infrastructure - 9,000 SF
Design
$5,000,000 CJ est. value
Dacono, CO 80514

Water Service Line Replacement Project
Infrastructure
Bidding
$500,000 CJ est. value
Greeley, CO 80634

Last Updated 12/07/2022 04:48 PM
Project Title

Anna Gimmestad Park Playground

Physical Address View project details and contacts
City, State (County) Greeley, CO 80631   (Weld County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $225,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Location United States, Colorado, Weld County Question Acceptance Deadline 11/18/2022 04:00 PM EST Questions are submitted online No The playground at Anna Gimmestad Park is being updated to better serve the needs of the surrounding neighborhood. The primary goal of this project is to remove the existing play equipment and safety surfacing and add a new playground within the existing footprint. Public engagement has indicated that nearby residents are most interested in a post and platform style play system with opportunities for climbing (Figure 1). In an open-ended survey question residents were asked what additional amenities or equipment offerings they would like to see in the new playground. Those responses are ranked in Figure 2. There was also an outreach event with approximately 60 kids from the Fun in the Sun program Kids were asked to vote on their favorite playground amenities using dot stickers on four boards showing many different styles of playgrounds with various features. Voting results and conversations from from this event supported the results from the online neighborhood survey results shown in Figures 1 and 2. It is worth noting that the children specifically requested tall slides and enough swings for the large number of kids that attend the afterschool program.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents