67KV Delta to 13.09Y / 7.56KV Wye With LTC 24/32/40MVA Power Transformers for Cumberland Road Substation
Infrastructure
Design
$700,000 CJ est. value
Fayetteville, NC 28306

RFP - Open Ended Designer Solicitations - 2023-2024
Term Contract
Bidding
East Fayetteville, NC 28301

3000 Psi Concrete With Fiber
Term Contract
Bidding
Fort Bragg, NC 28310

Creek Clearing Services
Term Contract
Sub-Bidding
Hope Mills, NC 28348

Recycling Processing Facility
Term Contract
Sub-Bidding
East Fayetteville, NC 28301

Portable Toilet Units
Term Contract
Post-Bid
Fayetteville, NC

Portable Toilet Units
Alteration
Post-Bid
Fayetteville, NC

On Call Removal of Limbs and Bulk Waste
Term Contract
Post-Bid
East Fayetteville, NC 28301

DPW Minor Construction Program MATOC
Term Contract
Post-Bid
$25,000 CJ est. value
Fort Bragg, NC 28307

Confined Space Communications Systems
Term Contract
Post-Bid
Fayetteville, NC 28303

Lot Cleaning of 7006 Pantego Dr
Term Contract
Post-Bid
Fayetteville, NC 28314

Excavator (Medium Size) 40200 Lbs or Equivalent
Term Contract
Post-Bid
East Fayetteville, NC 28301

Excavator (Small Size) 21000 Lbs or Equivalent
Term Contract
Post-Bid
East Fayetteville, NC 28301

Directed Biogas Derived from Swine Waste
Term Contract
Post-Bid
East Fayetteville, NC 28301

Three (3) 67K Delta to 13.08Y/7.56KV Wye With LTC 24/35.8/44.8MVA Power Transformers for Multiple Substations
Term Contract
Post-Bid
East Fayetteville, NC 28301

Last Updated 04/06/2023 02:20 PM
Project Title

Lot Cleaning (6447 Raeford Road)

Physical Address View project details and contacts
City, State (County) Fayetteville, NC 28304   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For the project entitled, Lot Cleaning The right is reserved to reject any or all bids and to waive all informalities concerning bid or award bid to the lowest, responsible bidder or bidders, taking into consideration quality, performance and the time specified in the proposals for the performance of the contract.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents