Similar Projects
Solstra Mixed Use Development / Solomon Hills
New Construction, Infrastructure
Conception
$20,000,000 CJ est. value
Santa Barbara, CA 93105

Central City Recreation Center - City of Santa Barbara
Demolition, New Construction, Renovation, Infrastructure
Conception
$21,000,000 CJ est. value
Santa Barbara, CA 93101

701 N. Milpas Mixed-Use
Demolition, New Construction, Infrastructure - 90,721 SF
Design
$15,800,000 CJ est. value
Santa Barbara, CA 93103

Tyler Winery (Tier II)
New Construction, Infrastructure - 17,004 SF
Design
$2,000,000 CJ est. value
Lompoc, CA 93436

RFQ/P Design - Construction Management Services for County of Santa Barbara Probations Headquarters Building
New Construction, Infrastructure - 35,000 SF
Bidding
$35,700,000 CJ est. value
Santa Barbara, CA 93101

RFP D/B - Design Build, Ground Based Strategic Deterrent Re-Entry Vehicle Facility, Vandenberg Space Force Base, CA
New Construction, Infrastructure - 2,322 SF
Post-Bid
$100,000,000 CJ est. value
Lompoc, CA 93436

Bates Canyon Toilet Replacement
Renovation
Post-Bid
$25,000 to $100,000 est. value
Santa Maria, CA 93454

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

North Trunk Line Rehabilitation Phase 4
Infrastructure
Results
$1,767,729 CJ est. value
Santa Maria, CA 93454

Cleveland Elementary School New Classrooms and Site Improvements Project
Demolition, New Construction, Infrastructure
Construction
$3,848,000 CJ est. value
Santa Barbara, CA 93103

2022 Street Pavement Digout Project
Infrastructure
Construction
$1,882,176 CJ est. value
Lompoc, CA 93436

In-N-Out - McMurray Road / Buellton
New Construction, Infrastructure - 3,885 SF
Pending Verification
$1,200,000 CJ est. value
Buellton, CA 93427

Mission Drive Apartments
New Construction, Infrastructure - 78,870 SF
Pending Verification
$20,000,000 CJ est. value
Solvang, CA 93463

Fairfield Inn & Suites by Marriott / Santa Barbara
New Construction, Infrastructure
Conception
$27,000,000 CJ est. value
Santa Barbara, CA 93101

Micheltorena Street Condominiums
New Construction, Infrastructure - 8,015 SF
Design
$2,200,000 CJ est. value
Santa Barbara, CA 93103

Last Updated 08/11/2023 11:20 AM
Project Title

Mission Creek at Oak Park Restoration Project

Physical Address View project details and contacts
City, State (County) Santa Barbara, CA 93101   (Santa Barbara County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $571,084 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 3, 2023, project was awarded to Waterways Consulting Inc, but awarded amount is not available.** The purpose of this project is to restore Mission Creek in Oak Park. Restoration could include non-native weed removal and re-vegetation with native plants, removal of steelhead passage barriers, biotechnical stabilization of eroding banks, removal of concrete from the creek channel, and improvement of trails and interpretive information. The Project is located at Oak Park in the City of Santa Barbara, and is described as follows: The Mission Creek at Oak Park Restoration Project will consist of removal of historical flood control structures, grading/profiling of the steam bed and natural bench areas, placement of engineered streambed materials, eucalyptus tree removal, utility relocation, and restoration planting of riparian habitat. The overall goal of this project is to enhance riparian habitat and water quality. Time for Final Completion. The Project must be fully completed within 40 working days from the start date set forth in the Notice to Proceed. City anticipates that the Work will begin on or about September 2023, but the anticipated start date is provided solely for convenience and is neither certain nor binding. Estimated Cost. The estimated construction cost is $571,084 License. This Project requires a valid California contractor's license for the following classification(s): A General Engineering Contractor, C-10 Electrical Contractor, D-49 Tree Service Contractor.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents