Reported | 04/23/2021 12:00 AM |
Project Title | Maintenance of the Tracy Lake Park |
Physical Address | View project details and contacts |
City, State (County) | Pennsboro, WV (Ritchie County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For Two separate contacts concerning the Maintenance of the Tracy Lake Park in Pennsboro, West Virginia during the year May 1, 2021 through April 30, 2022. A third contract for the maintenance of the Bonds Creek #1 Dam at Tracy Lake, Pennsboro WV is also available to be completed between May, 2021 and November, 2021. CONTRACT 1 – Park Landscaping Maintenance Duties: – Mowing in all areas that of the park that are currently/have been mowed or in need of being mowed. – Mowing around all structures. – Trimming in all areas that are currently/have been trimmed or in need of being trimmed.-Trimming around all structures -Trimming around lake as needed – Blowing all debris off all sidewalks as a result of mowing or trimming – Blowing all debris off all buildings as a result of mowing or trimming – Fallen trees and branches cleared in a timely manner. – Keep culverts clear of debris Maintenance Dates: May- September: Mowing/Trimming – Once every 2 weeks as weather permits. October: Mowing/Trimming – Once as weather permits May – April: Fallen trees/branches as needed May – April: Culverts 1x per month or as needed Contract 3: Dam Maintenance Duties – Investigate the cause and fill the animal burrows/sink holes on the upstream slop near the shoreline – Remove the aquatic vegetation from the shoreline of the upstream slope– Remove any trees and woody growth within 25 feet of the footprint of the dam structure – Remove debris from the trash rack of the riser structure – Remove debris from the shoreline of the upstream structure – Paint all exposed metal on the riser structure – Clear the vegetative growth and sediment from the filter drain outlet pipes – Remove sediment from the downstream channel – Seed and mulch bare areas on dam structure – Wave protection on shoreline of upstream slope – Create positive drainage on the bench of the downstream slope. |
||||||||||||
Details | Park/Playground, Renovation.
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |