Similar Projects
Laguna Boulevard Right Turn Lane to West Stockton Boulevard - WTR058 - City of Elk Grove
Infrastructure
Conception
Elk Grove, CA 95758

Laguna Creek Trail - Crossing at State Route 99 - WTL016 - City of Elk Grove
Infrastructure
Conception
$6,320,000 est. value
Elk Grove, CA 95624

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Laguna Creek and Whitehouse Creek Multi-Functional Corridor Project - WDR018 - City of Elk Grove
Infrastructure
Design
$3,164,000 est. value
Elk Grove, CA

Roadway Excavation, Place Cl2 Ab, HMA and RHMA, and Modify Ramp Meters
Infrastructure
Bidding
$28,000,000 est. value
CA

Place HMA, Furnish Polyester Concrete Overlay, and Concrete Barrier
Infrastructure
Bidding
$4,490,000 est. value
Sacramento, CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Cold Plane AC Pavement, Place HMA and Replace Concrete Slabs
Infrastructure, Alteration
Post-Bid
$4,860,000 est. value
CA

Upper Multi-Purpose Area Repairs and Improvements Kiefer Landfill
Infrastructure
Results
$225,000 est. value
Sloughhouse, CA 95683

Folsom Boulevard Complete Streets Phase 1
Infrastructure
Results
$5,400,000 est. value
Sacramento, CA

Willard Parkway Landscaping Epoch Drive To Kammerer Road - WFL011 - City Of Elk Grove
Alteration
Conception
$875,400 est. value
Elk Grove, CA 95757

Construct Two Auxiliary Lanes and Upgrade Four Ramp Metering Systems
Infrastructure, Alteration
Design
$17,583,000 est. value
Elk Grove, CA 95758

Souza Dairy Unit 2 - Lotz Parkway Improvement Plan
Infrastructure
Bidding
$600,000 est. value
Elk Grove, CA 95757

Duckhorn Drive Safety Improvement Project
Infrastructure
Post-Bid
$470,000 est. value
Sacramento, CA 95834

Hot Mix Asphalt (HMA) Concrete Grinder Dig Out Repair and Replacement Paving
Infrastructure
Results
CA

Reported 07/22/2022 12:00 AM
Project Title

Mangini Ranch Phase 2 Village 3 Joint Trench

Physical Address View project details and contacts
City, State (County) Folsom, CA   (Sacramento County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents