Similar Projects
Institutional Residence Remodel
Bidding
$207,000 est. value
Orem, UT 84058

Losee Center 309-311 Remodel
Renovation
Bidding
$140,000 est. value
Orem, UT 84058

Helix Building
New Construction - 250,000 SF
Sub-Bidding
$78,439,728 est. value

Utah Valley University - New Business Building
Post-Bid
Orem, UT

BYU Hinckley Center Remodel
Renovation - 83,793 SF
Post-Bid
Provo, UT 84604

Dfcm Construction-Uvu Pope Science Bldg Infill-20372790-Vbs Ae
New Construction - 9,000 SF
Results
Less than $265,000 est. value
Orem, UT

Dfcm Construction-Uvu Institutional Advancement Center-20374790-Vbs Ae
Results
Less than $6,400,000 est. value
Orem, UT

BYU Moot Courtroom and Deans Suite Remodel - Phase 2
Renovation - 3,444 SF
Construction
Provo, UT 84602

BA 103 Remodel
Renovation, Term Contract
Construction
$100,000 to $200,000 est. value
Orem, UT 84058

Remodel Lakemount Manor
Post-Bid
Less than $3,100,000 est. value
Orem, UT 84058

Elevator Modernization Mountainland Technical College
Results
$350,000 est. value
Orem, UT 84058

Lc 4Th Floor Build Out
Renovation, Build-Out - 1,333 SF
Construction
Orem, UT 84058

Lehi Campus Building Remodel
Renovation
Post-Bid
$400,000 est. value
Lehi, UT 84058

ME 110 Remodel
Renovation
Results
Orem, UT 84058

Byu Electrical Vaults Phase 3A
Renovation
Post-Bid
Provo, UT 84602

Last Updated 03/11/2020 11:38 AM
Project Title

DFCM Construction - UVU New Business Building - VBS Construction

Physical Address View project details and contacts
City, State (County) Orem, UT 84058   (Utah County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $61,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The UVU New School of Business and Campus Gateway Project is made up of two main components; a new Presidential Suite and Campus Gateway Building, and a New School of Business Building. The Campus Gateway and Presidential Suite portion is approximately 9,800 sf of new space and 20,000 sf of remodel space located between the existing Browning Administration Building and existing Woodbury School of Business. The new School of Business Building will be approximately 165,000 sf and will house accounting, finance, economics, strategic management, organizational leadership, graduate programs, and marketing departments.

Details

1 College/University, New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents