Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Mars Valencia Rd Culvert
Demolition, New Construction, Infrastructure
Conception
$300,000 CJ est. value
Pine Township, PA 15090

McLaughlin Run Rd #2
Demolition, New Construction, Infrastructure
Design
$2,600,000 CJ est. value
Upper Saint Clair, PA 15241

Eighth Avenue over Homestead Run
Demolition, New Construction, Infrastructure
Design
$3,220,000 CJ est. value
Pittsburgh, PA 15219

Enright Park Construction
Infrastructure
Bidding
$500,000 CJ est. value
Pittsburgh, PA 15206

Sedimentation Tank Rehabilitation
Infrastructure
Bidding
$397,700 CJ est. value
Pittsburgh, PA 15221

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Building Additions and Modifications - New Public Works Facilities
Infrastructure
Post-Bid
$200,000 CJ est. value
Swissvale, PA 15218

East Busway Bridge Rehabilitation
Infrastructure
Results
$6,057,777 CJ est. value
Pittsburgh, PA 15232

Design Build - Design activities limited to Concrete curb ramps
Renovation, Infrastructure
Results
$15,000,000 to $19,999,999 est. value
McKees Rocks, PA 15136

2022 Roadway Improvements - Contract No. 1
Infrastructure
Construction
$311,998 CJ est. value
Penn Township, PA 17331

Mon/Fayette Expressway, Section 53A1
Infrastructure
Construction
$213,983,732 CJ est. value
Duquesne, PA 15110

2021 Bond - Street Resurfacing Bituminous Paving Program - City of Pittsburgh
Infrastructure
Pending Verification
$15,809,505 CJ est. value
Pittsburgh, PA 15219

2021 Bond - Street Resurfacing - Concrete, Brick, And Blockstone Repair Program - City of Pittsburgh
Renovation
Pending Verification
$500,000 CJ est. value
Pittsburgh, PA 15219

Indiana Drive Culvert
Demolition, New Construction, Infrastructure
Conception
$1,600,000 CJ est. value
Penn Hills, PA 15147

Last Updated 01/05/2024 01:42 PM
Project Title

RFP D/B - I-376, Churchill to Monroeville

Physical Address View project details and contacts
City, State (County) Churchill, PA 15235   (Allegheny County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected January 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $70,171,328 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 5, 224, the project has not been awarded. A timeline for award has not been confirmed. This is a Partial Design Build Roadway Project. Design Activities Are Limited to: Traffic Control Plan (Phase 2&3). The Sr 376-a72 Parkway East Betterment Project Includes 2 Inches of Mill and Paving Along with Replacing the Entire Median Concrete Barrier. The Structure Work Includes Preservation and Superstructure Replacement on 8 Mainline Structures, 2 Overhead Structures, 1 Ramp Structure, a 4 Span Superstructure Replacement, and Other Miscellaneous Construction, All Within a Length of 23,827.66 Linear Feet (4.513 Miles) as Indicated on the Approved Drawings Included in the Bid Package for State Route 376 Section A72 in Allegheny County, Wilkins and Penn Hills Townships, Churchill and Monroeville Boroughs, Commonwealth of Pennsylvania. This Project Being Situated as Follows: From a Point Approximately 480 Feet East of the Sr 2048 (Us Route 22 Business) Interchange at Segment 0800/0801 Offset 0344 (Station 122+79) to the Sr 0022 (William Penn Highway) Interchange at Segment 0844/0845 Offset 0454/0692 (Station 363+09/363+87). Project Cost Range: $60,000,000.00 - $69,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 46.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - RFP D/B - I-376, Churchill to Monroeville *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents