Similar Projects
Z--Replace Water Control Structures 64 and 65
Design
Brigham City, UT 84302

Replacement of the Existing Water Diversion Structure of the Bench Canal Heading
Post-Bid
Duchesne, UT

Traverse Ridge Storm Drain
Post-Bid
Draper, UT

Hiawatha Project Phase 2: Culvert Stabilization
Results
$140,000 to $150,000 est. value
Hiawatha, UT

Sandy Canal Trail Design 9400 South to Lazon Drive
Results
Sandy, UT 84094

Segmented Pipe Liner
Term Contract
Post-Bid
UT

Vernal Drainage Project
Results
Vernal, UT 64078

Knolls Fire Erosion Mitigation Project Phase 2
Post-Bid
Less than $901,255 est. value
Saratoga Springs, UT 84045

South Valley MS4
Term Contract
Results
Draper, UT 84020

Concrete Reservoir
Post-Bid
Washington Terrace, UT 84405

Dollar Ridge Emergency Watershed Protection (EWP)
Results
Less than $6,115,760 est. value
Duchesne, UT

10th East Senior Center Retaining Wall
Post-Bid
Salt Lake City, UT 84114

Strawberry River Restoration
Results
Salt Lake City, UT

Hog Hollow Soil Repair
Post-Bid
Less than $175,000 est. value
Herriman, UT 84065

DFCM Construction-Pre Qualified Mechanical-WSU Library Drainage Upgrade
Results
Less than $115,000 est. value
Ogden, UT 84408

Last Updated 12/16/2021 02:05 PM
Project Title

North Hills Pond Maintenance Project

Physical Address View project details and contacts
City, State (County) Cedar, UT   (Emery County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide: services for the cleaning out and lining an existing livestock watering pond with clay located on the Bald Hills approximately 28 miles north of Cedar City, Utah. Pond location already exists and needs reconstruction or maintenance to allow water to be held over from snow and rain allowing sustainability for livestock and wildlife through the summer months. The approximate size of the pond is 32,000 square feet. Pond will need to be cleaned out, free of debris, widened and re-clayed so that water will not leach out. Clay should be applied at the rate 4lbs/sq.ft and then be tracked or packed into the soil. Location: This project is located on North Hills 28 miles north of Cedar City, Utah. The pond site is located north of Cedar City, Utah; approximately 10-20 miles. Elevation varies and is between 6,500 feet with moderate rolling topography some areas will require a high clearance vehicle. Vicinity map showing sites is enclosed.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents