Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ Engineering - Drinking Water System Infrastructure Project
Infrastructure
Bidding
$670,623 CJ est. value
Avon Park, FL 33825

RFP D/B - I-85 at SR 42/North Druid Hills Road
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Avon Park, FL 33825

Outfall Ditch Cleaning
Term Contract
Sub-Bidding
$215,000 CJ est. value
Arcadia, FL 34266

Property Clean-Up 1832 Washington Boulevard
Demolition, Infrastructure
Sub-Bidding
$20,000 CJ est. value
Lake Placid, FL 33852

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

RFQ Contractors - Abandoned Artesian Well Plugging
Infrastructure
Post-Bid
$500,000 CJ est. value
Avon Park, FL 33825

Placid Lakes Sidewalk Improvements ADA Transition Plan
Results
FL

Resurfacing
Results
Less than $2,066,728 est. value
FL 33852

RFP - Continuing Services PD&E/ETDM Support Activities
Term Contract
Post-Bid
$5,000,000 CJ est. value
Avon Park, FL 33825

Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Results

Caliber Car Wash / Sebring
Demolition, Infrastructure
Post-Bid
$1,200,000 est. value
Sebring, FL 33872

Intersection Improvement - Widening - Base Work
Infrastructure
Results
$1,750,277 est. value
FL

RFP Engineering - Districtwide Miscellaneous PE Design Consultant
Infrastructure
Post-Bid
$1,500,000 CJ est. value
Avon Park, FL 33825

Cr 623 (Kenilworth Boulevard) Mill and Resurfacing Between Mini Ranch Road and Haywood Taylor Boulevard
Infrastructure
Results
$1,200,000 est. value
Sebring, FL 33870

Last Updated 08/15/2022 03:09 PM
Project Title

Lake June Park Phase II, Construction of Second Phase of Parking and Park Roadway System

Physical Address View project details and contacts
City, State (County) Lake Placid, FL 33852   (Highlands County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $680,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Lake June Park Phase II, Construction of Second Phase of Parking and Park Roadway System

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents